Section one: Contracting entity
one.1) Name and addresses
SOLENT GATEWAY LIMITED
MERIDIAN HOUSE,ALEXANDRA DOCK NORTH
GRIMSBY
DN313UA
Contact
Scott Willmore
scott.willmore@solentgateway.com
Telephone
+44 7763634014
Country
United Kingdom
NUTS code
UKE13 - North and North East Lincolnshire
Companies House
09370825
Internet address(es)
Main address
https://www.solentgateway.com/
one.6) Main activity
Port-related activities
Section two: Object
two.1) Scope of the procurement
two.1.1) Title
Marchwood Port Development - Phase 1-3 Design and Build
two.1.2) Main CPV code
- 45000000 - Construction work
two.1.3) Type of contract
Works
two.1.4) Short description
Provision of services to undertake the design and construction of the Marchwood Port development (terrestrial works only).
Works include: Creation of large areas of hard-standing surfaces, modifications to main port entrance including the construction of a new security office building and entrance canopy, modification of existing internal road network and railway sidings, enhancement and upgrade of existing CCTV, drainage (including new outfalls), lighting, telecommunications, gas and power networks, perimeter fencing, demolition and/or modification to existing buildings and creation and enhancement of ecological areas including wider landscape improvements.
two.1.6) Information about lots
This contract is divided into lots: No
two.2) Description
two.2.2) Additional CPV code(s)
- 45000000 - Construction work
two.2.3) Place of performance
NUTS codes
- UKJ - South East (England)
Main site or place of performance
Marchwood Port, located next to the village of Marchwood, south-west of Southampton.
two.2.4) Description of the procurement
SGL have pursued consent for the proposed redevelopment of Marchwood Port via the Town and Country Planning Act.
Works are anticipated to be delivered in six phases between 2022 - 2027 with Phases 1 to 3 being the subject of this procurement and contract ("the Project").
The Project is intended to be delivered in three phases, although it is noted that capital expenditure associated with Phase 1 will deliver approximately 90-95% of value of the Project.
The works, which are mainly terrestrial based, are likely to comprise but are not limited to:
1. Creation of hard-standing surfaces (which forms the majority of the scope of work) providing flexible external storage for the following:
a. Containers
b. Vehicles
c. Steel (clean and scrap)
d. Forest Products
e. Bulks and aggregates
f. Palletised cargo.
2. Modifications to main port entrance including the construction of a new Security Office and Entrance Canopy (providing three vehicle lanes).
3. Enhancement and upgrade of existing CCTV, drainage (including 2no. new drainage outfalls), lighting, telecommunications, gas and power.
4. Enhancement and upgrade of the site perimeter fencing.
5. Modification of rail sidings.
6. Demolition and/or modification to existing buildings
SGL plan to appoint a contractor on a design-build basis with services summarised as follows:
Phase 1
• RIBA Stage 4 - Technical Design
• RIBA Stage 5 -Construction
Phase 2 and Phase 3
Step 1
• RIBA 3 - Developed Design (developed against agreed planning parameters).
• Reserved Matters/Detailed Planning Application
two.2.5) Award criteria
Quality criterion - Name: Legal / Weighting: 15
Quality criterion - Name: Methodology, Resources, Stakeholder Management, Programme, HSE, Social Value / Weighting: 35
Cost criterion - Name: Price, CE, Fee, Equipment Adjustment / Weighting: 50
two.2.11) Information about options
Options: No
Section four. Procedure
four.1) Description
four.1.1) Type of procedure
Negotiated procedure with prior call for competition
four.1.8) Information about the Government Procurement Agreement (GPA)
The procurement is covered by the Government Procurement Agreement: No
four.2) Administrative information
four.2.1) Previous publication concerning this procedure
Notice number: 2021/S 000-013479
four.2.9) Information about termination of call for competition in the form of a periodic indicative notice
The contracting entity will not award any further contracts based on the above periodic indicative notice
Section five. Award of contract
A contract/lot is awarded: Yes
five.2) Award of contract
five.2.1) Date of conclusion of the contract
13 June 2022
Section six. Complementary information
six.4) Procedures for review
six.4.1) Review body
Solent Gateway Ltd
Grimsby
Country
United Kingdom