Wimbledon Depot Technical Resource

  • First MTR South Western Trains Limited

F14: Notice for changes or additional information

Notice identifier: 2024/S 000-021773

Procurement identifier (OCID): ocds-h6vhtk-047173

Published 16 July 2024, 11:10am



Section one: Contracting authority/entity

one.1) Name and addresses

First MTR South Western Trains Limited

8th Floor,The Point, 37 North Wharf Road

LONDON

W21AF

Email

FRH-procurement.indirects@firstrail.com

Country

United Kingdom

Region code

UKI32 - Westminster

Companies House

07900320

Internet address(es)

Main address

https://www.southwesternrailway.com/


Section two: Object

two.1) Scope of the procurement

two.1.1) Title

Wimbledon Depot Technical Resource

Reference number

FG002467

two.1.2) Main CPV code

  • 50100000 - Repair, maintenance and associated services of vehicles and related equipment

two.1.3) Type of contract

Services

two.1.4) Short description

Wimbledon Depot Technical Resource

To be responsible for the maintenance, repair of SWR rolling stock, including the testing of HVAC and sanding systems, testing of components and equipment in accordance with South Western Railway specifications as required. The holder will adhere to local instructions, safety, quality and environmental procedures, rules and regulations in force.

Daily activities include (but are not limited to):

• Vehicle Maintenance including servicing, faultfinding, defect repair and seasonal campaign completion.

• Work order completion.

• Technical investigation.

• Attend unit Failures.

• Vehicle audits and inspections.

• On train investigation & analysis

• Incident response.

• Depot Protection duties.

12 staff in total

All MB3 (or equivalent)

Require a Project manager / supervisor that controls the staff and liaises with SWR PM

Shift pattern to be 4 on 4 off rotating days and nights 12 hours shifts 07:00 - 19:00, 19:00 - 07:00


Section six. Complementary information

six.6) Original notice reference

Notice number: 2024/S 000-019029


Section seven. Changes

seven.1) Information to be changed or added

seven.2) Other additional information

Removal of 'requirement for a Project manager / supervisor that controls the staff and liaises with SWR PM'

Included reference to Class 455 fleet.

Revised scope of requirements as follows;

Wimbledon Depot Technical Resource

To be responsible for assisting with the maintenance and repair of SWR Class 455 electric multiple units , in accordance with South Western Railway specifications as required. The holder will adhere to local instructions, safety, quality and environmental procedures, rules and regulations in force.

Daily activities include (but are not limited to):

• Vehicle Maintenance including servicing, fault finding, defect repair and seasonal campaign completion.

• Work order completion.

• Technical investigation.

• Attend unit Failures.

• Vehicle audits and inspections.

• On train investigation & analysis

• Incident response.

• Depot Protection duties.

12 staff in total

All to be competent rolling stock technicians (mechanical or electrical)

Shift pattern to be 4 on 4 off rotating days and nights 12 hours shifts 07:00 - 19:00, 19:00 - 07:00