Section one: Contracting entity
one.1) Name and addresses
CADENT GAS LIMITED
COVENTRY
CV7 9JU
Contact
Abby Warrender
Telephone
+44 7825832749
Country
United Kingdom
Region code
UKG13 - Warwickshire
Companies House
10080864
Internet address(es)
Main address
one.6) Main activity
Production, transport and distribution of gas and heat
Section two: Object
two.1) Scope of the procurement
two.1.1) Title
ALARM RECIEVING CENTRE - ARC TRANSITION
two.1.2) Main CPV code
- 79711000 - Alarm-monitoring services
two.1.3) Type of contract
Services
two.1.4) Short description
The NG ARC operates a complex (but resilient) technical solution including network domain(s), Windows Active Directory, network file storage, automated backup servers, Windows Server Update Services (WSUS), Simple Network Management Protocol (SNMP) servers, and anti-virus. NG has standardised and, where possible, hardened its software and hardware to aid simple and effective system management and confidence in the operation and cybersecurity of the system. The backbone of the ARC is the technology used to allow operators to monitor and operate the remote site systems, such as IDS, CCTV, PA and AACS. Without technology, the ARC serves no operational process, and, for this reason, the technical solution must be carefully designed according to the Operational Requirements (OR). With multiple sites operating multiple separate systems, a Physical Security Information Management (PSIM) system or Security Management System (SMS) is required to pull the various systems into a single interface.
two.1.6) Information about lots
This contract is divided into lots: No
two.2) Description
two.2.3) Place of performance
NUTS codes
- UK - United Kingdom
two.2.4) Description of the procurement
The NG ARC operates a complex (but resilient) technical solution including network domain(s), Windows Active Directory, network file storage, automated backup servers, Windows Server Update Services (WSUS), Simple Network Management Protocol (SNMP) servers, and anti-virus. NG has standardised and, where possible, hardened its software and hardware to aid simple and effective system management and confidence in the operation and cybersecurity of the system. The backbone of the ARC is the technology used to allow operators to monitor and operate the remote site systems, such as IDS, CCTV, PA and AACS. Without technology, the ARC serves no operational process, and, for this reason, the technical solution must be carefully designed according to the Operational Requirements (OR). With multiple sites operating multiple separate systems, a Physical Security Information Management (PSIM) system or Security Management System (SMS) is required to pull the various systems into a single interface.
two.2.11) Information about options
Options: Yes
Description of options
one two year extension;
or up to two one-year extensions;
Section four. Procedure
four.1) Description
four.1.1) Type of procedure
Restricted procedure
four.1.8) Information about the Government Procurement Agreement (GPA)
The procurement is covered by the Government Procurement Agreement: Yes
four.2) Administrative information
four.2.1) Previous publication concerning this procedure
Notice number: 2021/S 000-000004
Section five. Award of contract
A contract/lot is awarded: Yes
five.2) Award of contract
five.2.1) Date of conclusion of the contract
24 May 2023
Section six. Complementary information
six.4) Procedures for review
six.4.1) Review body
Cadent Gas Limited
COVENTRY
Country
United Kingdom