Section one: Contracting authority
one.1) Name and addresses
Torbay Council
Torbay Council Town Hall, Castle Circus
Torquay
TQ1 3DR
Contact
Mrs Joanna Pascoe
Telephone
+44 1803208517
Country
United Kingdom
NUTS code
UKK42 - Torbay
Internet address(es)
Main address
Buyer's address
one.4) Type of the contracting authority
Regional or local authority
one.5) Main activity
General public services
Section two: Object
two.1) Scope of the procurement
two.1.1) Title
Design, Supply, Refurbishment and Installation of Town Dock Torquay
Reference number
DN541592
two.1.2) Main CPV code
- 34955000 - Floating dock
two.1.3) Type of contract
Supplies
two.1.4) Short description
Six of the existing pontoons that form the wave screen for the marina need to be rubberised as the joints have become worn. This will require them to be removed from site for shot blasting and metal works. While they are off site a temporary wave screen will need to be put in place to protect the marina.
The access bridge to the marina also needs to be refurbished, this will also need to be taken off site for blasting and minor metal works. Temporary access will need to be put in place while the bridge is being refurbished.
The back walkway pontoon and three legs of the marina, along with all the mooring fingers need to be removed and replaced with new products. The existing utility supplies (water & power) will be swapped onto the new infrastructure. In order to keep the marina operational we anticipate the works to be phased over a maximum of three years.
two.1.6) Information about lots
This contract is divided into lots: No
two.2) Description
two.2.2) Additional CPV code(s)
- 45241000 - Harbour construction works
- 45248300 - Construction work for floating docks
- 45242200 - Marina construction work
- 45242210 - Yacht harbour construction work
two.2.3) Place of performance
NUTS codes
- UKK42 - Torbay
two.2.4) Description of the procurement
Six of the existing pontoons that form the wave screen for the marina need to be rubberised as the joints have become worn. This will require them to be removed from site for shot blasting and metal works. While they are off site a temporary wave screen will need to be put in place to protect the marina.
The access bridge to the marina also needs to be refurbished, this will also need to be taken off site for blasting and minor metal works. Temporary access will need to be put in place while the bridge is being refurbished.
The back walkway pontoon and three legs of the marina, along with all the mooring fingers need to be removed and replaced with new products. The existing utility supplies (water & power) will be swapped onto the new infrastructure. In order to keep the marina operational we anticipate the works to be phased over a maximum of three years.
two.2.5) Award criteria
Quality criterion - Name: Technical Questions / Weighting: 50
Quality criterion - Name: Social Value / Weighting: 10
Price - Weighting: 40
two.2.11) Information about options
Options: No
two.2.13) Information about European Union Funds
The procurement is related to a project and/or programme financed by European Union funds: No
Section four. Procedure
four.1) Description
four.1.1) Type of procedure
Open procedure
four.1.8) Information about the Government Procurement Agreement (GPA)
The procurement is covered by the Government Procurement Agreement: Yes
four.2) Administrative information
four.2.1) Previous publication concerning this procedure
Notice number: 2021/S 000-010069
Section five. Award of contract
A contract/lot is awarded: No
five.1) Information on non-award
The contract/lot is not awarded
No tenders or requests to participate were received or all were rejected
Section six. Complementary information
six.4) Procedures for review
six.4.1) Review body
Legal Services, Torbay Council
Torquay
Country
United Kingdom