Awarded contract

Oxford Phase 2 Works - Botley Bridge, Platform 5, Track & Crossovers

  • Network Rail Infrastructure Ltd

F06: Contract award notice – utilities

Notice reference: 2022/S 000-006518

Published 9 March 2022, 10:45pm



Section one: Contracting entity

one.1) Name and addresses

Network Rail Infrastructure Ltd

1 Eversholt Street

London

NW1 2DN

Email

Sarabjit.Lota@networkrail.co.uk

Telephone

+44 1908781000

Country

United Kingdom

NUTS code

UK - United Kingdom

Internet address(es)

Main address

www.networkrail.co.uk

Buyer's address

https://networkrail.bravosolution.co.uk/web/login.html

one.6) Main activity

Railway services


Section two: Object

two.1) Scope of the procurement

two.1.1) Title

Oxford Phase 2 Works - Botley Bridge, Platform 5, Track & Crossovers

Reference number

163390

two.1.2) Main CPV code

  • 45000000 - Construction work

two.1.3) Type of contract

Works

two.1.4) Short description

The award covered a single tender for detail design and construction.

Network Rail reserves the right, subject to funding and consents, to award the Works in part or in full.

Primarily, the works involve installation of a new bridge span to accommodate the new Platform 5 track.

Replacement of the main 4-track span of Botley Road bridge and the associated highway works required to provide compliant heights and gradients.

Provision of new downside, twin-face platform (Platform 5), a full length platform canopy and new staff and passenger facilities on the platform (waiting room, toilets, retail outlets and TOC accommodation).

A new western entrance to the station providing level access from Roger Dudman Way. Re-alignment of Roger Dudman Way and Cripley Road.

two.1.6) Information about lots

This contract is divided into lots: No

two.1.7) Total value of the procurement (excluding VAT)

Value excluding VAT: £65,475,131.90

two.2) Description

two.2.3) Place of performance

NUTS codes
  • UK - United Kingdom

two.2.4) Description of the procurement

Package 2B: Track Works – High Speed Crossovers: Three 75mph high speed crossovers will be installed to replace the current 25mph crossovers at Oxford North Junction to support improved East West Rail service provision to the OXD lines.

Package 2C: Botley Road Bridge: Installation of a new bridge span to accommodate the new Platform 5 track. Replacement of the main 4-track span of Botley Road bridge and the associated highway works required to provide compliant heights and gradients. Improved pedestrian and cycle routes under Botley Road bridge and replacement of the Beckett Street footbridge.

Package 2D: Oxford Station works, Western Entrance & Track Works: Provision of new downside, twin-face platform (Platform 5), a full length platform canopy and new staff and passenger facilities on the platform (waiting room, toilets, retail outlets and TOC accommodation). A new western entrance to the station

providing level access from Roger Dudman Way. Re-alignment of Roger Dudman Way and Cripley Road.

two.2.5) Award criteria

Quality criterion - Name: Technical & Methodology / Weighting: 42%

Quality criterion - Name: Programme / Weighting: 12%

Quality criterion - Name: Resources / Weighting: 6%

Quality criterion - Name: Sustainability / Weighting: Pass / Fail

Quality criterion - Name: Safety / Weighting: Pass / Fail

Quality criterion - Name: Compliance / Weighting: Pass / Fail

Cost criterion - Name: Fee / Weighting: 4%

Cost criterion - Name: Price / Weighting: 36%

two.2.11) Information about options

Options: Yes

Description of options

Network Rail will hold the GRIP 6-8 construction (implementation) as an employer's option as further detailed in the procurement documents. Which include but not limited to Western Entrance & Utility diversions.

Network Rail reserves the right to introduce and award works associated with level crossing closures and new footbridges (Package 2A)

two.2.13) Information about European Union Funds

The procurement is related to a project and/or programme financed by European Union funds: No


Section four. Procedure

four.1) Description

four.1.1) Type of procedure

Negotiated procedure with prior call for competition

four.1.8) Information about the Government Procurement Agreement (GPA)

The procurement is covered by the Government Procurement Agreement: No

four.2) Administrative information

four.2.1) Previous publication concerning this procedure

Notice number: 2021/S 000-007990


Section five. Award of contract

Contract No

ecm29871

Title

Oxford Phase 2 Works - Botley Bridge, Platform 5, Western Entrance.

A contract/lot is awarded: Yes

five.2) Award of contract

five.2.1) Date of conclusion of the contract

28 February 2022

five.2.2) Information about tenders

Number of tenders received: 3

Number of tenders received by electronic means: 3

The contract has been awarded to a group of economic operators: No

five.2.3) Name and address of the contractor

Kier Infrastructure & Overseas Limited

2nd Floor, Optimum House, Clippers Quay,

Salford

M50 3XP

Country

United Kingdom

NUTS code
  • UK - United Kingdom
National registration number

1157281

The contractor is an SME

No

five.2.4) Information on value of contract/lot (excluding VAT)

Total value of the contract/lot: £65,475,131.90


Section six. Complementary information

six.3) Additional information

The mandatory standstill period has been observed and now completed.

The contract was executed and now awarded.

six.4) Procedures for review

six.4.1) Review body

Network Rail Infrastructure Limited

Western House, 1 Holbrook Way,

Swindon

SN1 1BD

Country

United Kingdom

six.4.2) Body responsible for mediation procedures

High Court of England & Wales

Royal Courts of Justice, Strand

London

WC1A 2LL

Country

United Kingdom

six.4.4) Service from which information about the review procedure may be obtained

Network Rail Infrastructure Limited

Western House, 1 Holbrook Way,

Swindon

SN1 1BD

Country

United Kingdom