Section one: Contracting authority/entity
one.1) Name and addresses
Radius Housing
3-7 Redburn Square
Holywood
BT18 9HZ
Contact
via etenders messaging
Telephone
+44 3301230888
Country
United Kingdom
Region code
UK - United Kingdom
Internet address(es)
Main address
https://etendersni.gov.uk/epps
Buyer's address
https://etendersni.gov.uk/epps
one.1) Name and addresses
Radius Homes
3-7 Redburn Square
Holywood
BT18 9HZ
Telephone
+44 3301230888
Country
United Kingdom
Region code
UK - United Kingdom
Internet address(es)
Main address
https://etendersni.gov.uk/epps
Buyer's address
https://etendersni.gov.uk/epps
one.1) Name and addresses
Choice Housing
Leslie Morrell House 37 - 41 May Street
Belfast
BT1 4DN
Country
United Kingdom
Region code
UK - United Kingdom
Internet address(es)
Main address
https://etendersni.gov.uk/epps
Buyer's address
Section two: Object
two.1) Scope of the procurement
two.1.1) Title
RAD/144 - CONSTRUCTION PROJECT FOR SOCIAL HOUSING AT HANNAHSTOWN, BELFAST PH2.
two.1.2) Main CPV code
- 45210000 - Building construction work
two.1.3) Type of contract
Works
two.1.4) Short description
The proposed construction works contract is for a residential development of 260 social housing units on a greenfield site on the Glen Road, Hannahstown, Belfast that includes a housing mix of 176 homes including split level units, 3 wheelchair accessible bungalows and 81 apartments within 9 blocks including 1 ‘Happi Principles’ block which includes additional communal spaces. The site also includes extensive landscaping, a children’s play park, amenity space and other ancillary works. The complexity of this development includes site clearance, site remodelling due to site topography, removal of contamination, areas of ground conditions utility alterations, all engineering service and detailed phasing requirements. It is expected ALL social housing units built under this contract will achieve Secured by Design and Lifetime Homes accreditation. All units will also be required to achieve EPC Rating ‘A’. The project will also be delivered to BIM Level 2. A Planning Application for the project was submitted to Belfast City Council on 20/01/2023 and was validated on 24/02/2023. Ref Number LA04/2023/2557/F. Planning approval was granted at Planning Committee in June 2024, final conditions are being drafted by the Council, alongside a Section 76 Agreement which, once signed, will trigger the release of the Decision Notice. The contract will be for approximately 56 months from date of award and is scheduled to start in March 2025 with the ITT documentation being issued in Q4 2024. A summary of the proposed project is provided in the table below: Time is to be of the essence in delivering the Works and any failure by the Contractor to comply with the time limits for commencing or completing the works shall be deemed to be a substantial failure by the Contractor to comply with the contract giving the Employer a right to terminate the contract.
Section six. Complementary information
six.6) Original notice reference
Notice number: 2024/S 000-034378
Section seven. Changes
seven.1.2) Text to be corrected in the original notice
Section number
II.1.4)
Instead of
Text
The proposed construction works contract is for a residential development of 260 social housing units on a greenfield site on the Glen Road, Hannahstown, Belfast that includes a housing mix of 176 homes including split level units, 3 wheelchair accessible bungalows and 81 apartments within 9 blocks including 1 ‘Happi Principles’ block which includes additional communal spaces. The site also includes extensive landscaping, a children’s play park, amenity space and other ancillary works. The complexity of this development includes site clearance, site remodelling due to site topography, removal of contamination, areas of ground conditions utility alterations, all engineering service and detailed phasing requirements. It is expected ALL social housing units built under this contract will achieve Secured by Design and Lifetime Homes accreditation. All units will also be required to achieve EPC Rating ‘A’. The project will also be delivered to BIM Level 2. A Planning Application for the project was submitted to Belfast City Council on 20/01/2023 and was validated on 24/02/2023. Ref Number LA04/2023/2557/F. Planning approval was granted at Planning Committee in June 2024, final conditions are being drafted by the Council, alongside a Section 76 Agreement which, once signed, will trigger the release of the Decision Notice. The contract will be for approximately 56 months from date of award and is scheduled to start in March 2025 with the ITT documentation being issued in Q4 2024. A summary of the proposed project is provided in the table below: Time is to be of the essence in delivering the Works and any failure by the Contractor to comply with the time limits for commencing or completing the works shall be deemed to be a substantial failure by the Contractor to comply with the contract giving the Employer a right to terminate the contract
Read
Text
The proposed construction works contract is for the 1st section of a residential development on a greenfield site on the Glen Road, Hannahstown, Belfast. This phase is for the provision of 140 social housing units that includes a housing mix of 73 homes including split level units, 2 wheelchair accessible bungalows and 65 apartments within 7 blocks including 1 ‘Happi Principles’ block which includes additional communal spaces. The site also includes extensive landscaping, a children’s play park, amenity space and other ancillary works. Alongside the 140 units a programme of site wide enabling works will also be undertaken.
The 2nd section of this development will be tendered separately at a later date.
The complexity of this development includes site clearance, site remodelling due to site topography, removal of contamination, areas of ground conditions utility alterations, all engineering service and detailed phasing requirements.
It is expected ALL social housing units built under this contract will achieve Secured by Design and Lifetime Homes accreditation. All units will also be required to achieve EPC Rating ‘A’. The project will also be delivered to BIM Level 2.
A Planning Application for both phases of this project was submitted to Belfast City Council on 20/01/2023 and was validated on 24/02/2023. Ref Number LA04/2023/2557/F. Planning approval was granted at Planning Committee in June 2024, final conditions are being drafted by the Council, alongside a Section 76 Agreement which, once signed, will trigger the release of the Decision Notice
The contract will be for approximately 48 months from date of award and is scheduled to start in March 2025 with the ITT documentation being issued in Q4 2024.
A summary of the proposed project is provided in the table below: Time is to be of the essence in delivering the Works and any failure by the Contractor to comply with the time limits for commencing or completing the works shall be deemed to be a substantial failure by the Contractor to comply with the contract giving the Employer a right to terminate the contract.
Section number
II.1.5)
Instead of
Text
5000000.00
Read
Text
3000000.00
Section number
II.2.4)
Instead of
Text
The proposed construction works contract is for a residential development of 260 social housing units on a greenfield site on the Glen Road, Hannahstown, Belfast that includes a housing mix of 176 homes including split level units, 3 wheelchair accessible bungalows and 81 apartments within 9 blocks including 1 ‘Happi Principles’ block which includes additional communal spaces. The site also includes extensive landscaping, a children’s play park, amenity space and other ancillary works. The complexity of this development includes site clearance, site remodelling due to site topography, removal of contamination, areas of ground conditions utility alterations, all engineering service and detailed phasing requirements. It is expected ALL social housing units built under this contract will achieve Secured by Design and Lifetime Homes accreditation. All units will also be required to achieve EPC Rating ‘A’. The project will also be delivered to BIM Level 2. A Planning Application for the project was submitted to Belfast City Council on 20/01/2023 and was validated on 24/02/2023. Ref Number LA04/2023/2557/F. Planning approval was granted at Planning Committee in June 2024, final conditions are being drafted by the Council, alongside a Section 76 Agreement which, once signed, will trigger the release of the Decision Notice. The contract will be for approximately 56 months from date of award and is scheduled to start in March 2025 with the ITT documentation being issued in Q4 2024. A summary of the proposed project is provided in the table below: Time is to be of the essence in delivering the Works and any failure by the Contractor to comply with the time limits for commencing or completing the works shall be deemed to be a substantial failure by the Contractor to comply with the contract giving the Employer a right to terminate the contract
Read
Text
The proposed construction works contract is for the 1st section of a residential development on a greenfield site on the Glen Road, Hannahstown, Belfast. This phase is for the provision of 140 social housing units that includes a housing mix of 73 homes including split level units, 2 wheelchair accessible bungalows and 65 apartments within 7 blocks including 1 ‘Happi Principles’ block which includes additional communal spaces. The site also includes extensive landscaping, a children’s play park, amenity space and other ancillary works. Alongside the 140 units a programme of site wide enabling works will also be undertaken.
The 2nd section of this development will be tendered separately at a later date.
The complexity of this development includes site clearance, site remodelling due to site topography, removal of contamination, areas of ground conditions utility alterations, all engineering service and detailed phasing requirements.
It is expected ALL social housing units built under this contract will achieve Secured by Design and Lifetime Homes accreditation. All units will also be required to achieve EPC Rating ‘A’. The project will also be delivered to BIM Level 2.
A Planning Application for both phases of this project was submitted to Belfast City Council on 20/01/2023 and was validated on 24/02/2023. Ref Number LA04/2023/2557/F. Planning approval was granted at Planning Committee in June 2024, final conditions are being drafted by the Council, alongside a Section 76 Agreement which, once signed, will trigger the release of the Decision Notice
The contract will be for approximately 48 months from date of award and is scheduled to start in March 2025 with the ITT documentation being issued in Q4 2024.
A summary of the proposed project is provided in the table below: Time is to be of the essence in delivering the Works and any failure by the Contractor to comply with the time limits for commencing or completing the works shall be deemed to be a substantial failure by the Contractor to comply with the contract giving the Employer a right to terminate the contract.
Section number
II.2.6)
Instead of
Text
5000000.00
Read
Text
3000000.00
Section number
II.2.7)
Instead of
Text
56
Read
Text
48
Section number
IV.2.6)
Instead of
Date
21 May 2025
Local time
12:00pm
Read
Date
31 July 2025
Local time
12:00pm
Section number
IV.2.2)
Instead of
Date
22 November 2024
Local time
12:00pm
Read
Date
13 December 2024