Section one: Contracting authority
one.1) Name and addresses
Morgan Sindall Construction and Infrastucture
Allday House / Warrington Road, Birchwood
Warrington
WA3 6AU
Contact
Dawn Keenan
Country
United Kingdom
NUTS code
UKD11 - West Cumbria
National registration number
04273754
Internet address(es)
Main address
https://sharedsystems.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=15333&B=SELLAFIELD
one.2) Information about joint procurement
The contract is awarded by a central purchasing body
one.3) Communication
The procurement documents are available for unrestricted and full direct access, free of charge, at
https://sharedsystems.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=15333&B=SELLAFIELD
Additional information can be obtained from the above-mentioned address
one.4) Type of the contracting authority
Body governed by public law
one.5) Main activity
Other activity
Nuclear Decommissioning
Section two: Object
two.1) Scope of the procurement
two.1.1) Title
STEELWORK AND EXTERNAL ENVELOPE
Reference number
PPP/MPPKDP2/6
two.1.2) Main CPV code
- 45000000 - Construction work
two.1.3) Type of contract
Works
two.1.4) Short description
This package of work consists of Steelwork – known as KDP2 and External Envelope – known as KDP6. The scope includes all the typical elements of work usually associated with the delivery of steelwork, both structural and other, and the cladding of industrial buildings. It is intended that the scope includes the following general classifications of work. Please note that this list is non-exhaustive. Early Contractor Involvement, Final Design, Temporary Works, Structural Steelwork, Steel Frames, General Steelwork, Structural Metalwork, General Metalwork, Metal Decking, Metal Walkways, Edge Protection, Cladding and Roofing. All works to include supply and erect services. Early Contractor Involvement (ECI) is seen as one of the PPP’s key drivers to procure in this way, as it will enable the supply chain to have a long-term influence on the way in which projects are designed and delivered. This is a 18 year framework.
two.1.5) Estimated total value
Value excluding VAT: £249,000,000
two.1.6) Information about lots
This contract is divided into lots: No
two.2) Description
two.2.2) Additional CPV code(s)
- 45213250 - Construction work for industrial buildings
- 45213251 - Industrial units construction work
- 45223210 - Structural steelworks
- 45223220 - Structural shell work
- 45261213 - Metal roof-covering work
- 45262400 - Structural steel erection work
- 45262420 - Structural steel erection work for structures
two.2.3) Place of performance
NUTS codes
- UKD11 - West Cumbria
Main site or place of performance
UKD11 Sellafield Site
two.2.4) Description of the procurement
The Programme and Project Partners (PPP) at Sellafield are undertaking a procurement exercise to engage with Key Delivery Partner’s (KDP’s) via a Multi Project Procurement (MPP) process. The PPP model has been established to deliver approximately 25 projects consisting of new build, as well as some upgrade and refurbishment of existing buildings This package of work consists of Steelwork – known as KDP2 and External Envelope – known as KDP6. The scope includes all the typical elements of work usually associated with the delivery of steelwork, both structural and other, and the cladding of industrial buildings. It is intended that the scope includes the following general classifications of work. Please note that this list is non-exhaustive. Early Contractor Involvement, Final Design, Temporary Works, Structural Steelwork, Steel Frames, General Steelwork, Structural Metalwork, General Metalwork, Metal Decking, Metal Walkways, Edge Protection, Cladding and Roofing. All works to include supply and erect services. Early Contractor Involvement (ECI) is seen as one of the PPP’s key drivers to procure in this way, as it will enable the supply chain to have a long-term influence on the way in which projects are designed and delivered. The outcomes being projects that are delivered more safely, are better designed (innovative), of a higher quality, whilst being environmentally sympathetic, easier to maintain, delivered on time and within budget. The 18-year framework provides an unparalleled opportunity for the PPP and supply chain to develop long-term relationships that can grow and adapt organically over time, to create a world class legacy of excellence for the design and construction of nuclear facilities.
two.3) Estimated date of publication of contract notice
9 December 2021
Section four. Procedure
four.1) Description
four.1.8) Information about the Government Procurement Agreement (GPA)
The procurement is covered by the Government Procurement Agreement: No