Section one: Contracting entity
one.1) Name and addresses
NORTHERN GAS NETWORKS LIMITED
1100 Century Way Thorpe Park
LEEDS
LS158TU
Contact
Andrew Christophers
achristophers@northerngas.co.uk
Telephone
+44 7510367358
Country
United Kingdom
Region code
UKE42 - Leeds
Companies House
05167070
Internet address(es)
Main address
https://www.northerngasnetworks.co.uk
one.6) Main activity
Production, transport and distribution of gas and heat
Section two: Object
two.1) Scope of the procurement
two.1.1) Title
Town Pilot - Hydrogen production
two.1.2) Main CPV code
- 65200000 - Gas distribution and related services
two.1.3) Type of contract
Services
two.1.4) Short description
Since 2019 the Government have shown an increasing commitment to exploring the use of hydrogen as a solution for decarbonizing transport, industry and heat.
On 27th October 2022 the GB Gas Distribution Networks (GDNs) were issued a letter by Ofgem and BEIS (The Department for Business, Energy & Industrial Strategy) inviting them to put forward high level proposals for Town Pilot locations. These proposals must have the ability to provide and convert to hydrogen up to 20,000 properties comprising a mix of domestic, industrial and commercial by the end of 2030. Additionally, BEIS have requested that each location demonstrate the ability to undertake a phased scale up to convert up to 200,000 properties comprising a mix of domestic, industrial and commercial by 2037.
Submission for Town Pilot locations must be returned to BEIS no later than 20th January 2023. NGN are intending to submit 3 Town Pilot locations to BEIS which NGN believe meet the criteria that BEIS have set in terms of scalability and range of users converted.
The locations proposed are based within the regions of Humberside, Teesside & West Yorkshire
Modelling for each of the locations has been completed providing the expected hydrogen demand for end users within the initial Town Pilot location and at the end of the subsequent wider roll out. The hydrogen demand for each location is detailed below:
Tonnes per year Humberside 44,006, Teesside 58,850, West Yorkshire 51,898
NGN are currently developing submissions for each location and are releasing this expression of interest to identify potential hydrogen production partners within the chosen regions.
Hydrogen production facilities would need to be situated within the regions and have the capability of providing all or a percentage of the Town Pilot and eventual scale up demands as detailed above. Additionally, production facilities would need to be producing hydrogen by early 2030.
two.1.6) Information about lots
This contract is divided into lots: No
two.2) Description
two.2.3) Place of performance
NUTS codes
- UKC - North East (England)
- UKD - North West (England)
- UKE - Yorkshire and the Humber
two.2.4) Description of the procurement
Since 2019 the Government have shown an increasing commitment to exploring the use of hydrogen as a solution for decarbonizing transport, industry and heat.
On 27th October 2022 the GB Gas Distribution Networks (GDNs) were issued a letter by Ofgem and BEIS (The Department for Business, Energy & Industrial Strategy) inviting them to put forward high level proposals for Town Pilot locations. These proposals must have the ability to provide and convert to hydrogen up to 20,000 properties comprising a mix of domestic, industrial and commercial by the end of 2030. Additionally, BEIS have requested that each location demonstrate the ability to undertake a phased scale up to convert up to 200,000 properties comprising a mix of domestic, industrial and commercial by 2037.
Submission for Town Pilot locations must be returned to BEIS no later than 20th January 2023. NGN are intending to submit 3 Town Pilot locations to BEIS which NGN believe meet the criteria that BEIS have set in terms of scalability and range of users converted.
The locations proposed are based within the regions of Humberside, Teesside & West Yorkshire
Modelling for each of the locations has been completed providing the expected hydrogen demand for end users within the initial Town Pilot location and at the end of the subsequent wider roll out. The hydrogen demand for each location is detailed below:
Tonnes per year Humberside 44,006, Teesside 58,850, West Yorkshire 51,898
NGN are currently developing submissions for each location and are releasing this expression of interest to identify potential hydrogen production partners within the chosen regions.
Hydrogen production facilities would need to be situated within the regions and have the capability of providing all or a percentage of the Town Pilot and eventual scale up demands as detailed above. Additionally, production facilities would need to be producing hydrogen by early 2030.
two.2.11) Information about options
Options: No
Section four. Procedure
four.1) Description
four.1.1) Type of procedure
Negotiated procedure with prior call for competition
four.1.8) Information about the Government Procurement Agreement (GPA)
The procurement is covered by the Government Procurement Agreement: No
four.2) Administrative information
four.2.1) Previous publication concerning this procedure
Notice number: 2022/S 000-030780
Section five. Award of contract
A contract/lot is awarded: No
five.1) Information on non-award
The contract/lot is not awarded
Other reasons (discontinuation of procedure)