Forest Road, Lydney Geotechnical Stabilisation

  • Gloucestershire County Council

UK7: Contract details notice - Procurement Act 2023 - view information about notice types

Notice identifier: 2026/S 000-019562

Procurement identifier (OCID): ocds-h6vhtk-05ac25 (view related notices)

Published 4 March 2026, 2:57pm



Scope

Reference

DN790546

Description

The site is located on the B4234 approximately 1.8km Northwest of the town of Lydney, Gloucestershire. The B4234 carriageway is constructed on sidelong ground and runs parallel to the River Lyd. The River Lyd runs approximately 8m below the road level. The site was identified to have defects in 2023 and has been subject to regular monitoring.

The defects noted consisted of carriageway cracking, subsidence, leaning trees associated with lower slope instability and blocked gullies. A landslip occurred over a 20m length of earthwork adjacent to New Road in late 2023. The carriageway is showing signs of instability with cracking evident, and a steep face is now present at the edge of the westbound running lane.

The client is looking for a Principal Contractor to deliver the construction phase of this scheme.

Summary of Construction Phase key deliverables are as follows:

- Provision of suitable traffic management during construction works, including full road closure and signposted diversions.

- Installation of sheet piled retaining wall along an extent of 43 m - 1.6 m from carriageway edge.

- Pile lengths will vary with rockhead depth, typically reaching 8.0 m. Piles will be driven to the designed toe level and cut flush with adjacent ground.

- Construction of new drainage system including installation of a concrete bag headwall outfall within the embankment.

- Highways reconstruction including plaining and overlay.

- Installation of a VRS barrier system and wooden fencing over an extent of 131 m.

- Traffic signs, kerbing, and road markings.

- Coordination with BT utility diversions and protection works.

A summary of the outline programme is shown below:

Anticipated Works Start Date: Monday 9th February 2026

Completion: Friday 7th August 2026

Overall Duration: 26 Weeks

The proposed procurement route will be a single stage (Open Procedure) using the NEC4 ECC form of Contract, Option A Priced Contract with Activity Schedule.


Contract 1. Forest Road, Lydney Geotechnical Stabilisation

Supplier

Contract value

  • £929,703.77 excluding VAT
  • £1,115,644.52 including VAT

Below the relevant threshold

Date signed

15 January 2026

Contract dates

  • 9 February 2026 to 7 August 2026
  • 5 months, 27 days

Main procurement category

Works

CPV classifications

  • 45000000 - Construction work

Contract locations

  • UKK13 - Gloucestershire

Procedure

Procedure type

Below threshold - open competition


Supplier

MONTEL CIVIL ENGINEERING LIMITED

  • Companies House: 08949189
  • Public Procurement Organisation Number: PTLV-6345-TDRT

Suite A & B, Unit 1 Wainwright Road

Worcester

WR4 9FA

United Kingdom

Region: UKG12 - Worcestershire

Small or medium-sized enterprise (SME): Yes

Voluntary, community or social enterprise (VCSE): No

Contract 1. Forest Road, Lydney Geotechnical Stabilisation


Contracting authority

Gloucestershire County Council

  • Public Procurement Organisation Number: PZHT-7473-ZVPN

Shire Hall, Westgate Street

Gloucester

GL1 2TG

United Kingdom

Region: UKK13 - Gloucestershire

Organisation type: Public authority - sub-central government