Scope
Reference
1
Description
Swindon Borough Council invites you to contribute to preliminary market engagement in relation to the installation of upgraded fire alarms to 14 of Swindon Borough Councils' supported and sheltered schemes and would therefore welcome the views of suppliers on the questions set out in the questionnaire. Responses to this questionnaire will be used solely for this pre-tender exercise and any responses will not be referred to during the tender evaluation. To this end, tender-style responses to this questionnaire are not necessary - the intention is to invite supplier feedback on the options, to help shape the final specification and commercial model to ensure the tender delivers the optimum outcomes for the Council.
The Council intends on tendering a package of works in relation to 14 supported and sheltered schemes. Specifically, in relation to the design and installation of an upgraded fire alarm system, the works in question will include a hard-wired, self-testing, analogue addressable and automatic fire detection and alarm system in accordance with BS5839, with category L1 detection to the common areas and back of house. With LD1 Grade A to all residential units. These works are intended to be applied to 14 No. schemes across Swindon.
The concept designs in relation to the layout and schematic of these schemes have been completed, however contractors would be responsible for technical design (RIBA stage 4) through to commissioning and usage (RIBA stage 7).
The purpose of this preliminary market engagement is to gain market insight into the following aspects of the project: -
? Market Interest
? Contract/Project Length.
? Capacity
? Timescales.
? Design
? Specialist knowledge
To participate in the Preliminary Market Engagement Suppliers will need to Register as a Supplier with ProContract, www.supplyingthesouthwest.org.uk, then Register an Interest before obtaining access to the PME documents.
Responses are required to be submitted no later than 2nd June 2025, 1500 hrs UK Local time via ProContract tender portal - https://www.supplyingthesouthwest.org.uk/
Total value (estimated)
- £2,200,000 excluding VAT
- £2,640,000 including VAT
Below the relevant threshold
Contract dates (estimated)
- 31 March 2026 to 31 March 2027
- 1 year, 1 day
Main procurement category
Works
CPV classifications
- 45312100 - Fire-alarm system installation work
- 51700000 - Installation services of fire protection equipment
- 31625100 - Fire-detection systems
- 31625200 - Fire-alarm systems
Contract locations
- UKK14 - Swindon
Engagement
Engagement deadline
3 June 2025
Engagement process description
Swindon Borough Council invites you to contribute to preliminary market engagement in relation to the installation of upgraded fire alarms to 14 of Swindon Borough Councils' supported and sheltered schemes and would therefore welcome the views of suppliers on the questions set out in the questionnaire. Responses to this questionnaire will be used solely for this pre-tender exercise and any responses will not be referred to during the tender evaluation. To this end, tender-style responses to this questionnaire are not necessary - the intention is to invite supplier feedback on the options, to help shape the final specification and commercial model to ensure the tender delivers the optimum outcomes for the Council.
The Council intends on tendering a package of works in relation to 14 supported and sheltered schemes. Specifically, in relation to the design and installation of an upgraded fire alarm system, the works in question will include a hard-wired, self-testing, analogue addressable and automatic fire detection and alarm system in accordance with BS5839, with category L1 detection to the common areas and back of house. With LD1 Grade A to all residential units. These works are intended to be applied to 14 No. schemes across Swindon.
The concept designs in relation to the layout and schematic of these schemes have been completed, however contractors would be responsible for technical design (RIBA stage 4) through to commissioning and usage (RIBA stage 7).
The purpose of this preliminary market engagement is to gain market insight into the following aspects of the project: -
Market Interest
Contract/Project Length.
Capacity
Timescales.
Design
Specialist knowledge
To participate in the Preliminary Market Engagement Suppliers will need to Register as a Supplier with ProContract, www.supplyingthesouthwest.org.uk, then Register an Interest before obtaining access to the PME documents.
Responses are required to be submitted no later than 2nd June 2025, 1500 hrs UK Local time via ProContract tender portal - https://www.supplyingthesouthwest.org.uk/
Contracting authority
Swindon Borough Council
- Public Procurement Organisation Number: PNPT-6195-XDWV
Swindon Borough Council, Civic Offices, Euclid Street
Swindon
SN1 2JH
United Kingdom
Contact name: Ms Jodie Wakefield
Email: tenderinghousingproperty@swindon.gov.uk
Website: http://www.swindon.gov.uk
Region: UKK14 - Swindon
Organisation type: Public authority - sub-central government