Section one: Contracting authority
one.1) Name and addresses
LONDON BOROUGH OF HARINGEY
Civic Centre,High Road, Wood Green
LONDON
N228LE
Contact
Rupinder Chahal
rupinder.chahal@haringey.gov.uk
Telephone
+44 2084892989
Country
United Kingdom
Region code
UKI - London
Justification for not providing organisation identifier
Not on any register
Internet address(es)
Main address
Buyer's address
one.3) Communication
The procurement documents are available for unrestricted and full direct access, free of charge, at
Additional information can be obtained from the above-mentioned address
Tenders or requests to participate must be submitted electronically via
one.4) Type of the contracting authority
Regional or local authority
one.5) Main activity
General public services
Section two: Object
two.1) Scope of the procurement
two.1.1) Title
STANHOPE ROAD BRIDGE REPLACEMENT WORKS - 2023
two.1.2) Main CPV code
- 45200000 - Works for complete or part construction and civil engineering work
two.1.3) Type of contract
Works
two.1.4) Short description
Construction of a new steel warren truss footbridge with associated reinforced concrete ramp, stepped access, and landscaping, including demolition of the existing bridge.
two.1.5) Estimated total value
Value excluding VAT: £3,100,000
two.1.6) Information about lots
This contract is divided into lots: No
two.2) Description
two.2.3) Place of performance
NUTS codes
- UKI - London
Main site or place of performance
STANHOPE ROAD BRIDGE REPLACEMENT WORKS,
HIGHGATE, LONDON, N6 5DE
two.2.4) Description of the procurement
The London Borough of Haringey are seeking to procure a suitably competent contractor to deliver the works, which will be awarded using the ICC Measurement version Conditions of Contract.
The replacement footbridge structure has been designed to RIBA Stage 4 and takes the form of a 16m span steel warren truss supported on bored piled reinforced concrete abutments. The embankments are partially constructed in reinforced earth and new accesses to the Parkland Walkway are to be provided by reinforced concrete ramps and stairs. The site will require landscaping upon completion to blend into the nature reserve setting.
The worksite is formed by a restricted footprint immediately surrounding the structure and sits within an environmentally sensitive area, which will require limitations in access and methods of construction in order to mitigate ecologogical damage.
A separate compound area will be provided a distance of 60m north from the structure.
No diversions of Statutory Undertaker's plant are required, utilities in Stanhope road will only require a watching brief from statutory undertaker's engineers.
Planning approval has been granted for the scheme with conditions. The scheme contractor will be required to discharge a number of the planning Conditions prior to commencement and during the Works. All tender documents are available here; https://s2c.waxdigital.co.uk/ProcurementLBHaringey/DisplayModules/TradeModules/Negotiations/Opportunities/ListEvents.aspx
two.2.5) Award criteria
Price is not the only award criterion and all criteria are stated only in the procurement documents
two.2.6) Estimated value
Value excluding VAT: £3,100,000
two.2.7) Duration of the contract, framework agreement or dynamic purchasing system
Duration in months
10
This contract is subject to renewal
No
two.2.10) Information about variants
Variants will be accepted: No
two.2.11) Information about options
Options: No
two.2.14) Additional information
The London Borough of Haringey are seeking to procure a suitably competent contractor to deliver the works, which will be awarded using the ICC Measurement version Conditions of Contract.
The replacement footbridge structure has been designed to RIBA Stage 4 and takes the form of a 16m span steel warren truss supported on bored piled reinforced concrete abutments. The embankments are partially constructed in reinforced earth and new accesses to the Parkland Walkway are to be provided by reinforced concrete ramps and stairs. The site will require landscaping upon completion to blend into the nature reserve setting.
The worksite is formed by a restricted footprint immediately surrounding the structure and sits within an environmentally sensitive area, which will require limitations in access and methods of construction in order to mitigate ecologogical damage.
A separate compound area will be provided a distance of 60m north from the structure.
No diversions of Statutory Undertaker's plant are required, utilities in Stanhope road will only require a watching brief from statutory undertaker's engineers.
Planning approval has been granted for the scheme with conditions. The scheme contractor will be required to discharge a number of the planning Conditions prior to commencement and during the Works. All tender documents are available here; London Borough of Haringey - Upcoming Opportunities (waxdigital.co.uk)
Section four. Procedure
four.1) Description
four.1.1) Type of procedure
Open procedure
four.1.8) Information about the Government Procurement Agreement (GPA)
The procurement is covered by the Government Procurement Agreement: Yes
four.2) Administrative information
four.2.2) Time limit for receipt of tenders or requests to participate
Date
31 August 2023
Local time
12:00pm
four.2.4) Languages in which tenders or requests to participate may be submitted
English
four.2.7) Conditions for opening of tenders
Date
31 August 2023
Local time
1:00pm
Section six. Complementary information
six.1) Information about recurrence
This is a recurrent procurement: No
six.4) Procedures for review
six.4.1) Review body
London Borough of Haringey
London
Country
United Kingdom