Scope
Description
Scope and delivery of the work
The work consists of replacement kitchens and bathrooms. We need a contractor to supply and fit these consistent with the specification attached and in the case of kitchen replacements, liaise with both Housing Solutions and the kitchen supplier to carry out joint design surveys. We currently install Howdens kitchens (Greenwich Range) and will most likely continue to fit these. We do not have a direct relationship with Howdens and expect you to negotiate your own prices with them and allow for the supply in your basket rate. We assume you will engage a Resident Liaison Officer (RLO) and will liaise directly with the residents regarding, surveys, installation dates, general updates, correspondents, access arrangements and any issues that arise before, during and after the works.
Programme scale and duration
We intend appointing for an initial contract period of 3 years with the option to extend for a further two years on a 1 + 1 basis. We operate a two year budget but estimate our 2026-27 - 2028-29 budget will be up to £4m for kitchens and bathrooms and we expect to maintain similar budgets in future years. Therefore we estimate the max term spend to be up to £6.5m.
Geographical distribution
Housing Solutions was originally formed from transferred Local Authority homes in Maidenhead. These still form the majority of our homes, although there are post-1995 developments in Reading, High Wycombe, Slough, Bracknell, Farnborough, Wokingham, and other locations in Berkshire and Buckinghamshire.
Our 2026-27 programme could consist of approximately 300-500 homes across our estate. Around 70% of our stock are within the Maidenhead area, however there are some homes in other areas like Reading, Farnborough, Wokingham, Slough, Windsor, Bracknell.
Programming
We will leave programming of the work to you. We may have a small number of high-priority cases needing to be done earlier, but in general we would give you our address list for each financial year (April to March) and you can determine your own programme to deliver it. We expect that once work on an individual property have commenced, they are completed within 10 working days for kitchens and 8 working days for bathrooms where practicable and these targets will form part of the KPI suite. The priority is to give the tenant clear timescales, which are met. We would expect essential services (kitchen sink, heating, electricity gas and water) to be restored at the end of each working day.
CDM
We will appoint the Quoin Consultancy as Principal Designer, you will be appointed Principal Contractor. We assume you will prepare the key documents and Quoin will check them against the regulations.
Pricing model
Works will be priced on basket rates per the attached specification with variation on M3NHF SOR Version 7.0. There may be an option to put forward an additional / alternative bid that features another brand (not Howdens).
Ordering and payment
• Works will be issued on an individual order and variations must be approved in line with the variations process before they are actioned. Final invoiced amounts must be raised within 2 months of completion, to avoid a backlog of invoices.
• Invoices will not be processed until all certification has been received (Uploaded into a portal or drop box) including, but not limited to electrical certification (installation & minor works), gas safety certificate, kitchen designs, customers selection surveys and customer satisfaction surveys.
• You will also be expected to update our works portal (Connect) so the progress of all works can be monitored throughout the duration of the contract.
Form of contract
The form of contract will be the JCT Minor Works (MW2024)
KPIs
• Installations completed within agreed periods
• 100% Customer satisfaction feedback.
• 100% Quality inspection pass rate
• Adherence to programme prepared by contractor
• Client portal updates.
Total value (estimated)
- £6,500,000 excluding VAT
- £6,500,000 including VAT
Above the relevant threshold
Contract dates (estimated)
- 1 April 2026 to 31 March 2029
- Possible extension to 31 March 2031
- 5 years
Description of possible extension:
Maximum term 5yrs (3+1+1)
Options
The right to additional purchases while the contract is valid.
There may be an option to put forward an additional / alternative bid that features another brand (not Howdens). There may also be associated upgrading and repair works.
Main procurement category
Works
CPV classifications
- 45421151 - Installation of fitted kitchens
- 39141400 - Fitted kitchens
- 45211310 - Bathrooms construction work
Contract locations
- UKJ - South East (England)
Participation
Legal and financial capacity conditions of participation
TBC
Technical ability conditions of participation
TBC
Particular suitability
Small and medium-sized enterprises (SME)
Submission
Publication date of tender notice (estimated)
9 June 2025
Enquiry deadline
4 July 2025, 12:00pm
Submission type
Tenders
Tender submission deadline
14 July 2025, 12:00pm
Submission address and any special instructions
Tender submissions are to be received via the MyTenders portal (https://www.mytenders.co.uk/)
Tenders may be submitted electronically
Yes
Languages that may be used for submission
English
Award decision date (estimated)
31 December 2025
Other information
Payment terms
TBC
Description of risks to contract performance
TBC
Procedure
Procedure type
Competitive flexible procedure
Competitive flexible procedure description
This pre-procurement notice is being issued in order to generate an awareness and interest in an upcoming contracting opportunity for the supply and installation of Kitchens and Bathrooms (approximate max term value up to £6.5m).
All bidders will need to register with and upload their company details on the Central Digital Platform, along with their supply chain information prior to the indicative dates given for Tender notice release.
The exact format of the CFP is still being worked through but a summary of the anticipated procedure is provided below:
Stage 1: Quality Assessment (30-40%)
Deselection
Stage 2: Presentation / site-visit (10%)
Possible Deselection
Stage 3 : Pricing Negotiations (50-60%)
Selection/Contract Award
Bidders are likely to be down-selected on Quality before a presentation / site-visit stage is held. Once Quality scores have been finalised, there will be a negotiation stage before Pricing scores are finalised.
As both Quality and Price are important to us, the anticipated Quality / Price ratio will either be 50/50 or 60/40 in favour of Price.
A draft Pricing Matrix and draft Service Specification have been included with this notice for comment - closing date for comments will be 12 noon on 21st May 2025.
Documents
Documents to be provided after the tender notice
All correspondence (wherever possible), should take place via the MyTenders portal (https://www.mytenders.co.uk/).
Contracting authority
Housing Solutions
- Public Procurement Organisation Number: PGDY-4627-RBZL
Crown House, Crown Square
Berkshire
SL6 8BY
United Kingdom
Contact name: Jon Richardson
Telephone: +441628543120
Email: jon.richardson@housingsolutions.co.uk
Website: https://www.housingsolutions.co.uk/
Region: UKJ11 - Berkshire
Organisation type: Public undertaking (commercial organisation subject to public authority oversight)