Section one: Contracting authority/entity
one.1) Name and addresses
Greater Manchester Combined Authority
GMCA Offices, 1st Floor, Churchgate House, 56 Oxford Street
Manchester
M1 6EU
Contact
Mrs Ruth Peck
Ruth.Peck@greatermanchester-ca.gov.uk
Telephone
+44 7955311148
Country
United Kingdom
Region code
UK - United Kingdom
Internet address(es)
Main address
http://www.manchesterfire.gov.uk/
Buyer's address
Section two: Object
two.1) Scope of the procurement
two.1.1) Title
GMCA 825 Household Waste Recycling Centre at Reliance Street, Manchester
Reference number
DN763551
two.1.2) Main CPV code
- 45000000 - Construction work
two.1.3) Type of contract
Works
two.1.4) Short description
GMCA are seeking to provide a new HWRC facility at Reliance Street to improve recycling
rates, improve traffic management and provide improved waste segregation. The existing
facility is an aging asset with a small and inefficient layout.
The proposed development has been designed to ensure efficiency of movement from both
public and operational perspectives, from a public point of view, this means provision of
separate entrance and exit off Reliance Street and provision of double lane width around
the one-way system.
This layout will improve access and traffic management particularly in higher volume
periods, allowing Suez to safely manage traffic during higher demand periods.
The scope of the works for related to the proposed HWRC includes, but is not limited to:
Site establishment – accommodation, welfare and enabling works.
Page 4 to 8
Site clearance works
Demolition and removal of structures, slabs and services
Ground works, all below ground construction and drainage activities
Pilling works and structures, concrete works and surface finishes as per the tender
drawings and pilling details provided in Appendix D – Kellers Pilling Proposal
Boundary fencing, railings, access stairs and barriers
All white lining and pedestrian line colour markings and site signage.
Installation and integration of re-use shop and welfare building (Reuse container and
welfare building to be supplied by GMCA)
Electrical, Lighting, CCTV and other service installations
All required testing and commissioning
Site De-mobilisation
Project completion
Section six. Complementary information
six.6) Original notice reference
Notice number: 2025/S 000-005254
Section seven. Changes
seven.1.2) Text to be corrected in the original notice
Section number
IV.2
Place of text to be modified
IV.2.2
Instead of
Date
4 April 2025
Local time
12:00pm
Read
Date
10 April 2025
Local time
12:00pm