22/012 - GNI (UK) Brighouse Bay Compressor Station, LV Switchgear Replacement

  • GNI (UK) Limited

F06: Contract award notice – utilities

Notice identifier: 2023/S 000-011178

Procurement identifier (OCID): ocds-h6vhtk-033b40

Published 19 April 2023, 9:42am



Section one: Contracting entity

one.1) Name and addresses

GNI (UK) Limited

Scotland

Kirkcudbright

DG64TR

Contact

Tender Admin

Email

Tenders@gasnetworks.ie

Country

United Kingdom

Region code

UKM - Scotland

Justification for not providing organisation identifier

Not on any register

Internet address(es)

Main address

http://www.gasnetworks.ie

one.6) Main activity

Production, transport and distribution of gas and heat


Section two: Object

two.1) Scope of the procurement

two.1.1) Title

22/012 - GNI (UK) Brighouse Bay Compressor Station, LV Switchgear Replacement

Reference number

22/012

two.1.2) Main CPV code

  • 31214000 - Switchgear

two.1.3) Type of contract

Supplies

two.1.4) Short description

GNI (UK) Brighouse Bay Compressor Station, LV Switchgear Replacement

two.1.6) Information about lots

This contract is divided into lots: No

two.1.7) Total value of the procurement (excluding VAT)

Value excluding VAT: 555,018 EUR

two.2) Description

two.2.3) Place of performance

NUTS codes
  • UKM - Scotland

two.2.4) Description of the procurement

GNI UK Ltd acting as reasonable and prudent gas transporter are committed to operating a safe, reliable and

sustainability transmission and distribution network.

GNI UK own and operate the high pressure natural gas South West Scotland Onshore System (SWSOS) which

connects the upstream Great Britain (GB) National Transmission System (NTS) to the Republic of Ireland (RoI),

Northern Ireland (NI) and Isle of Man systems via subsea interconnector pipelines.

Brighouse Bay Compressor Station (BBCS) is a critical node located on the SWSOS consisting of six (6)

gas turbine compressor units which ensure safe and secure onward transportation of natural gas to the RoI

transmission system and Isle of Man offtake.

Brighouse Bay electrical demand is served by two (2) 11kV / 400V transformer substations, two (2) low voltage

(LV) electrical switchroom / motor control centres (MCC1 and MCC2) and one standby diesel generator.

MCC1 is in operation since the station was first commissioned in 1993. MCC1 electrical assets consist of one

(1) main distribution switchgear panel, three (3) motor control centres panels (MCC A, B, C), one (1) large

general services and lighting distribution panel and one (1) power factor correction panel. The main distribution

panel also incorporates transformer protection and standby generator controls.

MCC1 serves as the primary power distribution hub for the Brighouse admin and control building, utility

and services building, workshops, compressor halls and is critical for the reliable operation and continuous

availability of three (3) turbine compressor units (Units A, B, C).

GNI UK commissioned a site wide review of the Brighouse electrical installation in 2018. Findings from the

study show MCC1 electrical equipment has reached end of useful life with some functional units now obsolete.

The study also highlights constraints associated with operability and functionality of the current switchgear

arrangement, circuity configuration, means of isolation, and working area / operational access.

The study recommends to replace and upgrade all MCC1 equipment and install a new temporary transportable

generator inlet connection / changeover panel.

GNI UK now wish to procure the replacement of all associated MCC1 switchgear as detailed in the BBCS

switchgear specification (Ref. 18074-20-SP-0001)

The specification covers the design, manufacture, factory acceptance testing, storage, handling, delivery, site

re-assembly, verification testing and pre-commissioning of LV power switchgear and control gear.

Equipment to be supplied includes one (1) main distribution switchgear panel, three (3) motor control centre

panels (MCC), one (1) general service distribution board, one (1) power factor correction panel, and one (1)

transportable generator inlet / changeover panel.

two.2.5) Award criteria

Price

two.2.11) Information about options

Options: No


Section four. Procedure

four.1) Description

four.1.1) Type of procedure

Award of a contract without prior publication of a call for competition in the cases listed below

  • The works, supplies or services can be provided only by a particular economic operator for the following reason:
    • absence of competition for technical reasons

Explanation:

Fundamental to the successful delivery of goods or services is the economic operators ability to demonstrate

the switchgear solution offered can be manufactured, delivered, reassembled and installed in accordance

with BBCS switchgear specification (Ref. 18074-20-SP-0001) without the need to alter the basis of design,

specification, extend or substantially reconstruct the existing building.

Optimised design footprint and orientation for all switchgear assemblies is essential for installation, retermination

of existing cables, future operation and maintenance due to the limited working area available.

MCC1 supplies power to critical turbine compressor machinery which cannot be fully isolated for the duration of

work therefore the switchgear offered must be designed and manufactured to allow for the equipment to be

reassembled and installed in sequence over a phased construction period.

Having conducted initial market consultation with a number of OEMs and licenced switchgear manufacturers

followed by three (3) competitive procurement procedures between 2020 - 2022, Eaton Electrical Systems

Limited Ireland have emerged as the only economic operator who have demonstrated capability to meet the

requirements of the BBCS switchgear specification in full.

Previous tender submissions and clarifications received from other tenderers failed to demonstrate or guarantee

compliance with GNI UK requirements.

All previous tenderers could not provide an optimised switchgear geometry tailored for site installation as per the

layouts and orientation detailed in the specification.

Some tender submissions did not offer withdrawable switchgear. Some tender submissions did not comply in full

with internal arc fault criteria as specified.

four.1.8) Information about the Government Procurement Agreement (GPA)

The procurement is covered by the Government Procurement Agreement: Yes

four.2) Administrative information

four.2.1) Previous publication concerning this procedure

Notice number: 2022/S 000-013474


Section five. Award of contract

Contract No

1

Title

22/012 - BBCS LV Switchgear Replacement

A contract/lot is awarded: Yes

five.2) Award of contract

five.2.1) Date of conclusion of the contract

30 November 2022

five.2.2) Information about tenders

Number of tenders received: 1

The contract has been awarded to a group of economic operators: No

five.2.3) Name and address of the contractor

Eaton Electrical Systems Limited

Dublin 4, Ireland

Dublin 4

Country

Ireland

NUTS code
  • IE - Ireland
Justification for not providing organisation identifier

Not on any register

The contractor is an SME

Yes

five.2.4) Information on value of contract/lot (excluding VAT)

Total value of the contract/lot: 555,018 EUR


Section six. Complementary information

six.4) Procedures for review

six.4.1) Review body

The High Court

High Court Central Office, Four Courts, Inns Quay

Dublin

Email

highcourtcentraloffice@courts.ie

Telephone

+35 318886000

Country

Ireland

Internet address

http://www.courts.ie