Section one: Contracting authority
one.1) Name and addresses
Department of Health and Social Care
39 Victoria Street
London
SW1H 0EU
procurement.operations@dhsc.gov.uk
Country
United Kingdom
NUTS code
UKI32 - Westminster
Internet address(es)
Main address
https://www.gov.uk/government/organisations/department-of-health-and-social-care
Buyer's address
https://www.gov.uk/government/organisations/department-of-health-and-social-care
one.4) Type of the contracting authority
Ministry or any other national or federal authority
one.5) Main activity
Health
Section two: Object
two.1) Scope of the procurement
two.1.1) Title
Purchase of Flow Wrapping Equipment
two.1.2) Main CPV code
- 31720000 - Electromechanical equipment
two.1.3) Type of contract
Supplies
two.1.4) Short description
Provision of Flow Wrapping Equipment for automatically foil wrapping assembled LFT Cassettes at high capacity.
two.1.6) Information about lots
This contract is divided into lots: No
two.1.7) Total value of the procurement (excluding VAT)
Value excluding VAT: £1,524,235
two.2) Description
two.2.3) Place of performance
NUTS codes
- UK - United Kingdom
two.2.4) Description of the procurement
Provision of Flow Wrapping Equipment for automatically foil wrapping assembled LFT Cassettes at high capacity.
two.2.5) Award criteria
Price
two.2.11) Information about options
Options: No
two.2.13) Information about European Union Funds
The procurement is related to a project and/or programme financed by European Union funds: No
Section four. Procedure
four.1) Description
four.1.1) Type of procedure
Award of a contract without prior publication of a call for competition in the cases listed below
- Extreme urgency brought about by events unforeseeable for the contracting authority
Explanation:
1. The COVID-19 outbreak is a Public Health Emergency of International Concern as declared by the World Health Organisation on 30 January 2020. The WHO Director General characterised COVID-19 as a pandemic on 11 March 2020.2. A key element of ensuring an effective response to the pandemic is ensuring that there is adequate testing. Therefore, ensuring surge LFT capacity, including sufficient availability of Lateral Flow Tests, is critical. 3. Mass testing of the UK Population is a key step in bringing the Pandemic under control. (Lateral Flow Tests produce quicker results than the current PCR (Polymerase Chain Reaction) test, and do not require a lab processing step.) LFT tests have only recently become viable as a means of testing, with multiple tests being progressed through to certification and approval. This was unforeseen by the DHSC and outside its control.4. Critical steps in the manufacture of LFT tests include automated dispensing of biologically active agents onto reels of backing material and laminating – this is termed Primary Manufacture.5. Further steps required include mounting the test strip in a cassette housing to allow handling, and foil wrapping with desiccant to protect the unit from dust and damp up to the point that it is used – this is termed Secondary manufacture.6. LFT Primary and Secondary Manufacturing equipment are in short supply. The existing supply chains of this equipment are volatile - there are few suppliers worldwide, their order books have long lead times, and what stocks of equipment there are, rapidly are sold. 7. Award of the contract to Paramount Packaging Systems Ltd. for the purchase of automated rapid flow wrapping machinery for LFT secondary manufacture was necessary with immediate effect to meet the timescales necessary for setting up viable production lines for early 2021. The items under this Contract are long lead items (12 weeks) and there is insufficient time to organise an advertised competition that would meet the required timescales.8. DHSC is satisfied the tests permitting use of the Negotiated procedure without prior publication (Regulation 32(2)(c)) are met:A. As far as is strictly necessary: The surge LFT capacity was identified as strictly necessary to meet the demand to scale up the testing programme in the UK.B. There are genuine reasons for extreme urgency: It is responding to COVID-19 immediately because of public health risks presenting a genuine emergency.C. The events that have led to the need for extreme urgency were unforeseeable: The Commission itself confirmed: “The current coronavirus crisis presents an extreme and unforeseeable urgency – precisely for such a situation our European rules enable public buyers to buy within a matter of days, even hours, if necessary.” (Commissioner Breton, Internal Market, 01.04.2020).D. It is impossible to comply with the usual timescales in the PCR: It is not possible to comply with the timescales of another procedure due to the urgent requirement to ensure effective surge capacity.E. The situation is not attributable to the contracting authority – DHSC has not done anything to cause or contribute to the need for extreme urgency
four.1.8) Information about the Government Procurement Agreement (GPA)
The procurement is covered by the Government Procurement Agreement: Yes
Section five. Award of contract
A contract/lot is awarded: Yes
five.2) Award of contract
five.2.1) Date of conclusion of the contract
24 March 2021
five.2.2) Information about tenders
Number of tenders received: 1
The contract has been awarded to a group of economic operators: No
five.2.3) Name and address of the contractor
Paramount Packaging Systems Limited
Fleet Business Park, Sandy Lane, Fleet
Fleet
GU52 8BF
Country
United Kingdom
NUTS code
- UK - United Kingdom
National registration number
02860023
The contractor is an SME
Yes
five.2.4) Information on value of contract/lot (excluding VAT)
Initial estimated total value of the contract/lot: £1,524,235
Total value of the contract/lot: £1,524,235
Section six. Complementary information
six.4) Procedures for review
six.4.1) Review body
The High Court
Strand
London
WC2A 2LL
generaloffice@administrativecourtoffice.justice.gov.uk
Country
United Kingdom