Section one: Contracting authority/entity
one.1) Name and addresses
Rochdale Metropolitan Borough Council
4th Floor, Waterside House, Waterside Plaza
Sale
M33 7ZF
Contact
Mr Farooq Rashid
Farooq.Rashid@star-procurement.gov.uk
Telephone
+44 1619121616
Country
United Kingdom
Region code
UKD3 - Greater Manchester
Internet address(es)
Main address
Buyer's address
Section two: Object
two.1) Scope of the procurement
two.1.1) Title
Chamber House Solar Farm EPC Contract (ERDF)
Reference number
DN620562
two.1.2) Main CPV code
- 45000000 - Construction work
two.1.3) Type of contract
Works
two.1.4) Short description
Rochdale Borough Council (RBC) on behalf of Rochdale Development Agency (RDA) are tendering for a Contractor who is required to carry out the design, engineering, procurement, construction, testing, commissioning and handover of the Chamber House Solar Farm (the Solar Farm, or Project) and then operate and maintain the system until Completion. This project forms part of the wider Unlocking Clean Energy in Greater Manchester (UCEGM) European Regional Development Funded (ERDF) project and as such is part grant funded by ERDF
The Solar Farm shall have a 30-year design life and shall generate and export power to the Point of Supply (PoS) defined in the grid connection offer provided by Electricity North West (ENW, or the Distribution Network Operator (DNO)).
Section six. Complementary information
six.6) Original notice reference
Notice number: 2022/S 000-032424
Section seven. Changes
seven.1) Information to be changed or added
seven.1.2) Text to be corrected in the original notice
Section number
II.1.7
Place of text to be modified
Total value of the procurement (excluding VAT)
Instead of
Text
Value excluding VAT: £3,999,999
Read
Text
Value excluding VAT: £5,999,966.00
seven.2) Other additional information
Rochdale Borough Council (RBC) on behalf of Rochdale Development Agency (RDA) are tendering for a Contractor who is required to carry out the design, engineering, procurement, construction, testing, commissioning and handover of the Chamber House Solar Farm (the Solar Farm, or Project) and then operate and maintain the system until Completion. This project forms part of the wider Unlocking Clean Energy in Greater Manchester (UCEGM) European Regional Development Funded (ERDF) project and as such is part grant funded by ERDF
The Solar Farm shall have a 30-year design life and shall generate and export power to the Point of Supply (PoS) defined in the grid connection offer provided by Electricity North West (ENW, or the Distribution Network Operator (DNO)).