Section one: Contracting authority
one.1) Name and addresses
North London Waste Authority
Unit 1b Berol House, 25 Ashley Road, Tottenham Hale
London
N17 9LJ
Telephone
+44 2084895867
Country
United Kingdom
NUTS code
UKI43 - Haringey and Islington
Internet address(es)
Main address
Buyer's address
http://www.northlondonheatandpower.london/
one.4) Type of the contracting authority
Regional or local authority
one.5) Main activity
Environment
Section two: Object
two.1) Scope of the procurement
two.1.1) Title
Energy Recovery Facility ('ERF') Construction Works including all Buildings, Infrastructure and Works for the North London Heat and Power Project ('NLHPP')
two.1.2) Main CPV code
- 45222100 - Waste-treatment plant construction work
two.1.3) Type of contract
Works
two.1.4) Short description
North London Waste Authority (the "Authority") is seeking a contractor to design, procure, construct, commission and test a ERF including all associated buildings, infrastructure and landscaping works at its Edmonton EcoPark site in Edmonton, London N18 3AG in relation to the NLHPP (the "Contract"). The Contract also includes training of operational staff by the Contractor. The NLHPP is a programme of works to be carried out for the Authority at its 'EcoPark' site, in Edmonton, London N18 3AG. The works are the fundamental component in the delivery of the NLHPP and associated works at the Edmonton EcoPark pursuant to a development consent order granted to the Authority on 24/02/2017.
two.1.6) Information about lots
This contract is divided into lots: No
two.1.7) Total value of the procurement (excluding VAT)
Value excluding VAT: £799,339,566
two.2) Description
two.2.2) Additional CPV code(s)
- 42320000 - Waste incinerators
- 45200000 - Works for complete or part construction and civil engineering work
- 51135110 - Installation services of waste incinerators
two.2.3) Place of performance
NUTS codes
- UKI54 - Enfield
Main site or place of performance
Edmonton, N18 3AG
two.2.4) Description of the procurement
The Authority is seeking a contractor to design and construct the following works: (i) the ERF that consists of two identical process lines each comprising moving grate combustion unit, heat recovery boiler, combined flue gas treatment system incorporating selective catalytic reduction, a common turbine-generator/condensing system and all associated auxiliary systems; (ii) all civil engineering, buildings, architectural treatment, utilities connection, landscaping and other site works; (iii) ERF Weighbridges and ancillary offices; (iv) transport offices, workshops and parking for on-site operational vehicles; (v) vehicle wash; (vi) administration/operations offices and staff facilities; (vii) windshield and flues; (viii)) cooling condensers; (ix) raw water pre-treatment plant; (x) ERF Fire Water Tank and associated fire protection systems; (xi) electrical substation, works and connections; (xii) gas compound, works and connections; (xiii) other utility connections including communications and water; (xiv) workshops, stores and maintenance contractors area; and (xv) wastewater treatment plant and associated works. The contractor shall deliver all design, engineering, procurement, construction, commissioning, testing, operator training and handover requirements for the new ERF including all buildings, infrastructure and works. The contractor shall deliver all design, engineering, procurement, construction, commissioning, testing, operator training and handover requirements for the ERF including all associated buildings, infrastructure and landscape works. The contractor shall comply with the requirements of the CDM Regulations 2015 in relation to the roles of the Principal Contractor and Principal Designer for this Contract. The Authority may require the Contractor to provide operational services during the Defects Liability period. Further details of the required works are set out in the procurement documents. The Memorandum of Information provides background information on the Authority, the NLHPP and a summary of the key contract terms in relation to these works. The works are on the critical path for the delivery of the NLHPP for the development of a replacement ERF and associated works at the Edmonton EcoPark pursuant to a development consent order (The North London Heat and Power Generating Station Order (2017/215) as amended) granted to the Authority on 24/02/2017. The site for the Works, Edmonton EcoPark, is an operational waste management site where LondonEnergy Ltd, a private company wholly owned by the Authority, operates an existing Energy from Waste ("EfW") facility. Normal operation of the EfW facility is to be maintained at all times during the construction.
two.2.5) Award criteria
Quality criterion - Name: Technical, Quality and Management / Weighting: 70
Cost criterion - Name: Commercial / Weighting: 30
two.2.11) Information about options
Options: No
Section four. Procedure
four.1) Description
four.1.1) Type of procedure
Competitive dialogue
four.1.8) Information about the Government Procurement Agreement (GPA)
The procurement is covered by the Government Procurement Agreement: Yes
four.2) Administrative information
four.2.1) Previous publication concerning this procedure
Notice number: 2020/S 135-333685
four.2.9) Information about termination of call for competition in the form of a prior information notice
The contracting authority will not award any further contracts based on the above prior information notice
Section five. Award of contract
A contract/lot is awarded: Yes
five.2) Award of contract
five.2.1) Date of conclusion of the contract
24 January 2022
five.2.2) Information about tenders
Number of tenders received: 1
Number of tenders received from SMEs: 0
Number of tenders received by electronic means: 1
The contract has been awarded to a group of economic operators: No
five.2.3) Name and address of the contractor
Acciona Industrial S.A.
C/Anabel Segura, 11
Madrid
28108 Alcobendas
Country
Spain
NUTS code
- ES300 - Madrid
The contractor is an SME
No
five.2.4) Information on value of contract/lot (excluding VAT)
Initial estimated total value of the contract/lot: £683,000,000
Total value of the contract/lot: £799,339,566
five.2.5) Information about subcontracting
The contract is likely to be subcontracted
Value or proportion likely to be subcontracted to third parties
Value excluding VAT: £670,264,480
Proportion: 84 %
Short description of the part of the contract to be subcontracted
The elements to be subcontracted are the boiler package, mechanical (excluding boiler), piping, electrical, I&C supply, civils, erection works, and commissioning, as well as some additional general scope.
Section six. Complementary information
six.4) Procedures for review
six.4.1) Review body
North London Waste Authority
Unit 1b Berol House, 25 Ashley Road, Tottenham Hale
London
N17 9LJ
Telephone
+44 2084895867
Country
United Kingdom