Section one: Contracting authority
one.1) Name and addresses
Choice Housing
Leslie Morrell House 37 - 41 May Street
Belfast
BT1 4DN
Contact
corporate.procurement
corporate.procurement@choice-housing.org
Country
United Kingdom
Region code
UK - United Kingdom
Internet address(es)
Main address
https://etendersni.gov.uk/epps
Buyer's address
https://etendersni.gov.uk/epps
one.4) Type of the contracting authority
Body governed by public law
one.5) Main activity
Housing and community amenities
Section two: Object
two.1) Scope of the procurement
two.1.1) Title
PRN1458: Carolan Road HQ
two.1.2) Main CPV code
- 45210000 - Building construction work
two.1.3) Type of contract
Works
two.1.4) Short description
Refurbishment of, and extension to, existing listed building to provide new organisational headquarters. The proposed scheme involves refurbishment of the existing historic building, based on surveys of the existing, and is summarised below: - Remove and replace existing natural slate roof covering. Reuse salvaged slate to rear roof slopes. New slate covering and installation of insulation. Replace existing lead valleys, aprons and flashings with Code 6 lead on new plywood boards. - Reuse existing clay ridge tiles. Install ventilated ride and mechanically refix ridge tiles. - Replace existing lead flat roofs with Code 8 lead to current LSA standards. - Replace existing bitumen flat roofs with single ply membrane. - Rebuild existing roof access dormer cheeks with Code 6 lead on new plywood lining. - Allow for replacement windows. - Re-bed all existing limestone coping stones with lime mortar. - New dormers to rear elevation of main roof. Dormers to match existing. - New Conservation roof lights to rear elevations of main roof. - Replacement glazed lantern to refectory roof, detailing to match existing. - Replacement glazed roof structure over lay-light above RE103, detailing to match existing. - Repairs to all existing chimneys: Carefully dismantle top tier of existing chimneys. Rebuild to match existing incorporating lead trays. - Repointing of refectory chimney with lime mortar. - Extensive brick replacement where defective bricks are identified by the Conservation Architect. All replacement bricks to be in a matching red brick. Brick replacement to be scheduled on site. - Limestone replacement where defective stones are identified by the Conservation Architect. All replacement stones to be in a matching limestone. Stone replacement to be scheduled on site. - Rake out all mortar joints to a depth of 20mm and repoint with lime mortar. - Refurbish existing moulded cast-iron guttering, replacements to match where required. - Replacement of all aluminium goods in cast iron. No original cast iron downpipes or waste pipes remain. - Repairs and refurbishment of existing windows. Upgrade with slim double glazing. - Repairs and refurbishment of existing doors. - Remove religious imagery including crosses and carved icons. Replace with new finial. - Recess for carved good shepherd icon on east elevation to be repurposed to provide new attic window. - New roof and wall vents for intake and exhaust of mechanical services. Detailing to be visually appropriate. Repair of existing historic fabric will be conservation-led, and undertaken by contractors with demonstrable skill and experience of work to listed buildings. The replacement of architectural features will be historically accurate and appropriate to the building, based on physical evidence on site and replication of existing historic profiles. Restoration work will be carried out using materials which are appropriate to the original building, and constitute the minimal intervention necessary to consolidate the historic fabric. The proposed extension sits within the courtyard formed between the ‘C’ shaped plan of the existing convent building to the South, east and West and the Chapel to the North. The extension is conceived to meet the requirement for a communal space as part of the proposals within which the organisation can gather staff and host gathering in connection with the operation of their business. As part of the extension alterations will be carried to a rear return currently housing a secondary staircase to enable a compliant fire stair to be extended to the attic. Within the courtyard adjacent to the rear return will be an external lift shaft and service riser. The extension, stair core and lift shaft have been designed congruently to provide level access to the extension and mezzanine.
two.1.6) Information about lots
This contract is divided into lots: No
two.2) Description
two.2.2) Additional CPV code(s)
- 45453100 - Refurbishment work
two.2.3) Place of performance
NUTS codes
- UKN - Northern Ireland
two.2.4) Description of the procurement
Refurbishment of, and extension to, existing listed building to provide new organisational headquarters. The proposed scheme involves refurbishment of the existing historic building, based on surveys of the existing, and is summarised below: - Remove and replace existing natural slate roof covering. Reuse salvaged slate to rear roof slopes. New slate covering and installation of insulation. Replace existing lead valleys, aprons and flashings with Code 6 lead on new plywood boards. - Reuse existing clay ridge tiles. Install ventilated ride and mechanically refix ridge tiles. - Replace existing lead flat roofs with Code 8 lead to current LSA standards. - Replace existing bitumen flat roofs with single ply membrane. - Rebuild existing roof access dormer cheeks with Code 6 lead on new plywood lining. - Allow for replacement windows. - Re-bed all existing limestone coping stones with lime mortar. - New dormers to rear elevation of main roof. Dormers to match existing. - New Conservation roof lights to rear elevations of main roof. - Replacement glazed lantern to refectory roof, detailing to match existing. - Replacement glazed roof structure over lay-light above RE103, detailing to match existing. - Repairs to all existing chimneys: Carefully dismantle top tier of existing chimneys. Rebuild to match existing incorporating lead trays. - Repointing of refectory chimney with lime mortar. - Extensive brick replacement where defective bricks are identified by the Conservation Architect. All replacement bricks to be in a matching red brick. Brick replacement to be scheduled on site. - Limestone replacement where defective stones are identified by the Conservation Architect. All replacement stones to be in a matching limestone. Stone replacement to be scheduled on site. - Rake out all mortar joints to a depth of 20mm and repoint with lime mortar. - Refurbish existing moulded cast-iron guttering, replacements to match where required. - Replacement of all aluminium goods in cast iron. No original cast iron downpipes or waste pipes remain. - Repairs and refurbishment of existing windows. Upgrade with slim double glazing. - Repairs and refurbishment of existing doors. - Remove religious imagery including crosses and carved icons. Replace with new finial. - Recess for carved good shepherd icon on east elevation to be repurposed to provide new attic window. - New roof and wall vents for intake and exhaust of mechanical services. Detailing to be visually appropriate. Repair of existing historic fabric will be conservation-led, and undertaken by contractors with demonstrable skill and experience of work to listed buildings. The replacement of architectural features will be historically accurate and appropriate to the building, based on physical evidence on site and replication of existing historic profiles. Restoration work will be carried out using materials which are appropriate to the original building, and constitute the minimal intervention necessary to consolidate the historic fabric. The proposed extension sits within the courtyard formed between the ‘C’ shaped plan of the existing convent building to the South, east and West and the Chapel to the North. The extension is conceived to meet the requirement for a communal space as part of the proposals within which the organisation can gather staff and host gathering in connection with the operation of their business. As part of the extension alterations will be carried to a rear return currently housing a secondary staircase to enable a compliant fire stair to be extended to the attic. Within the courtyard adjacent to the rear return will be an external lift shaft and service riser. The extension, stair core and lift shaft have been designed congruently to provide level access to the extension and mezzanine.
two.2.5) Award criteria
Quality criterion - Name: Quality / Weighting: 20
Cost criterion - Name: price / Weighting: 80
two.2.11) Information about options
Options: No
two.2.13) Information about European Union Funds
The procurement is related to a project and/or programme financed by European Union funds: No
Section four. Procedure
four.1) Description
four.1.1) Type of procedure
Restricted procedure
four.1.8) Information about the Government Procurement Agreement (GPA)
The procurement is covered by the Government Procurement Agreement: No
four.2) Administrative information
four.2.1) Previous publication concerning this procedure
Notice number: 2021/S 000-003873
Section five. Award of contract
Contract No
1
A contract/lot is awarded: No
five.1) Information on non-award
The contract/lot is not awarded
Other reasons (discontinuation of procedure)
Section six. Complementary information
six.4) Procedures for review
six.4.1) Review body
Royal courts of Justice
Belfast
Country
United Kingdom