Section one: Contracting authority
one.1) Name and addresses
Mid and East Antrim Borough Council
Ardeevin, 80 Galmorgan Road
Ballymena
BT42 1AB
procurement@midandeastantrim.gov.uk
Country
United Kingdom
Region code
UKN0F - Mid and East Antrim
Internet address(es)
Main address
https//www.midandeastantrim.gov.uk
one.3) Communication
The procurement documents are available for unrestricted and full direct access, free of charge, at
https://e-sourcingni.bravosolution.co.uk
Additional information can be obtained from the above-mentioned address
Tenders or requests to participate must be submitted electronically via
https://e-sourcingni.bravosolution.co.uk
Tenders or requests to participate must be submitted to the above-mentioned address
one.4) Type of the contracting authority
Regional or local authority
one.5) Main activity
General public services
Section two: Object
two.1) Scope of the procurement
two.1.1) Title
ICT SERVICES FOR STABILISATION AND REPAIR WORKS OF CARRICKFERGUS PEIRS
Reference number
T675/AD
two.1.2) Main CPV code
- 71311000 - Civil engineering consultancy services
two.1.3) Type of contract
Services
two.1.4) Short description
The Client invites tenders to provide the service for an ICT in relation to stabilisation and repair works of Carrickfergus Piers from RIBA stages 3-6.
A Carrickfergus Harbour Condition Assessment reports was completed in 2018 by AECOM and updated in 2023 by Doran’s. The 2023 updated Condition Assessment of Carrickfergus Harbour report along with its, Options for Remedial Works, has been used to develop the business case and is the preferred option of works.
The project is for the provision of an ICT to assist the client in the delivery of stabilisation and repair works of Carrickfergus Piers.
Works to include but not limited to:
The consult to review the Doran’s Condition Assessment of Carrickfergus Harbour & Remedial Works Report carried out in 2023 and provide an addendum to the current condition of the harbour structures highlighting priority repairs which are to be included as part of the contract.
Albert Edward Peir
- Anode replacement
- Anode Installation
- RC Skin to parapet wall
Alexandra Pier
- Investigate the purpose and ownership of the piles close to the gangway ramp
- Visual inspection of the slab above the structure
- Resurfacing works
- Anode replacement
- RC skin to parapet wall
William Pier
- Removal of marine growth
- Replace missing stones
- Repointing with lime mortar
- Sealed culvert: install stone facing similar to existing to the upstream and downstream faces. Wedged concrete to be saw cut flush with the structure.
Possible removal works of old smuggles cove restaurant.
two.1.6) Information about lots
This contract is divided into lots: No
two.2) Description
two.2.3) Place of performance
NUTS codes
- UKN0F - Mid and East Antrim
two.2.4) Description of the procurement
The Client invites tenders to provide the service for an ICT in relation to stabilisation and repair works of Carrickfergus Piers from RIBA stages 3-6.
A Carrickfergus Harbour Condition Assessment reports was completed in 2018 by AECOM and updated in 2023 by Doran’s. The 2023 updated Condition Assessment of Carrickfergus Harbour report along with its, Options for Remedial Works, has been used to develop the business case and is the preferred option of works.
The project is for the provision of an ICT to assist the client in the delivery of stabilisation and repair works of Carrickfergus Piers.
Works to include but not limited to:
The consult to review the Doran’s Condition Assessment of Carrickfergus Harbour & Remedial Works Report carried out in 2023 and provide an addendum to the current condition of the harbour structures highlighting priority repairs which are to be included as part of the contract.
Albert Edward Peir
- Anode replacement
- Anode Installation
- RC Skin to parapet wall
Alexandra Pier
- Investigate the purpose and ownership of the piles close to the gangway ramp
- Visual inspection of the slab above the structure
- Resurfacing works
- Anode replacement
- RC skin to parapet wall
William Pier
- Removal of marine growth
- Replace missing stones
- Repointing with lime mortar
- Sealed culvert: install stone facing similar to existing to the upstream and downstream faces. Wedged concrete to be saw cut flush with the structure.
Possible removal works of old smuggles cove restaurant.
two.2.5) Award criteria
Price is not the only award criterion and all criteria are stated only in the procurement documents
two.2.7) Duration of the contract, framework agreement or dynamic purchasing system
Duration in months
24
This contract is subject to renewal
No
two.2.10) Information about variants
Variants will be accepted: No
two.2.11) Information about options
Options: No
two.2.13) Information about European Union Funds
The procurement is related to a project and/or programme financed by European Union funds: No
Section four. Procedure
four.1) Description
four.1.1) Type of procedure
Open procedure
four.1.8) Information about the Government Procurement Agreement (GPA)
The procurement is covered by the Government Procurement Agreement: Yes
four.2) Administrative information
four.2.2) Time limit for receipt of tenders or requests to participate
Date
18 March 2025
Local time
12:00pm
four.2.4) Languages in which tenders or requests to participate may be submitted
English
four.2.7) Conditions for opening of tenders
Date
18 March 2025
Local time
12:01pm
Section six. Complementary information
six.1) Information about recurrence
This is a recurrent procurement: No
six.4) Procedures for review
six.4.1) Review body
Mid and East Antrim Borough Council
Ballymena
Country
United Kingdom