Section one: Contracting authority/entity
one.1) Name and addresses
The Tall Ship Glenlee Trust
150 Pointhouse Place
Glasgow
G3 8RS
Contact
Fiona Greer
Telephone
+44 1413573699
Country
United Kingdom
NUTS code
UK - United Kingdom
Internet address(es)
Main address
Buyer's address
https://www.publiccontractsscotland.gov.uk/search/Search_AuthProfile.aspx?ID=AA30775
Section two: Object
two.1) Scope of the procurement
two.1.1) Title
REPLACEMENT DISABLED ACCESS LIFT FOR SV GLENLEE (THE TALL SHIP GLENLEE)
two.1.2) Main CPV code
- 42416100 - Lifts
two.1.3) Type of contract
Supplies
two.1.4) Short description
The historic vessel, The Tall Ship Glenlee requires a replacement accessibility lift to be purchased and installed using funds from Museums Galleries Scotland Repair and Adaptation Fund.
Contractor turnkey project requirement definition:-
1. Lift as presently configured with four access/ egress levels in weather deckhouse, ‘tween decks, mezzanine deck, hold, DDA compliant.
2. Platform lift capable of carrying a minimum load of 450kg and have a capacity alternatively for 5 persons.
3. Power – single phase 220 V AC.
4. Capable of operation in up to 2 degrees of ship list and 1 degree change of fore and aft trim of ship.
5. Does not need to meet fire evacuation requirements.
6. Design must accommodate the limited pit depth of <150mm.
7. Meet or exceed 2006/42CE.
8. All works must comply with CDM regs.
9. Lift must be capable of a minimum of 20 operational cycles per hour.
10. Normal duty cycle is 8 hours per day with some operational days of up to 24 hours per day.
11. A five-year warranty on all parts and labour/ hours is required.
12. A five-year maintenance package is required.
13. A key control is required to avoid unauthorised operations.
14. Turnkey project for removal of all components of old lift installation and installation and commissioning of new lift.
15. All responsibility for measurements, design, removal of old equipment and materials arisings from site.
16. All transportation of equipment and materials, lifting and craneage are part of the turnkey contract.
17. All works must comply with relevant Health and Safety at Work Act requirements.
18. Insurance must be provided for a sum of GBP 10 million pounds for any one occurrence.
19. Product liability insurance in the sum of GBP 10 million pounds in the aggregate and professional indemnity insurance in the aggregate.
Client site works: - Works on essential support steel substructures for lift in lower hull steelwork blasting inspection, any necessary strengthening and protective coating whilst old lift removed must be completed before new lift installation.
Section six. Complementary information
six.6) Original notice reference
Notice number: 2025/S 000-083806
Section seven. Changes
seven.1) Information to be changed or added
seven.1.2) Text to be corrected in the original notice
Section number
IV.2.2
Place of text to be modified
Time limit
Instead of
Date
16 January 2026
Local time
12:00pm
Read
Date
23 January 2026
Local time
12:00pm
Section number
II.2.7
Place of text to be modified
Duration Start
Instead of
Date
30 January 2026
Read
Date
6 February 2026
Section number
II.2.7
Place of text to be modified
Duration End
Instead of
Date
13 March 2026
Read
Date
20 March 2026
Section number
IV.2.6
Place of text to be modified
Minimum time frame during which the tenderer must maintain the tender
Instead of
Date
16 February 2026
Read
Date
23 February 2026
Section number
IV.2.7
Place of text to be modified
Conditions for opening of tenders
Instead of
Date
23 January 2026
Local time
12:00pm
Read
Date
30 January 2026
Local time
12:00pm
seven.2) Other additional information
No notes of interest so far