Award

Initial Refurbishment, Maintenance and Service for Gas Engines / Gensets ITT

  • LANCASHIRE RENEWABLES LIMITED

UK6: Contract award notice - Procurement Act 2023 - view information about notice types

Notice identifier: 2026/S 000-002425

Procurement identifier (OCID): ocds-h6vhtk-058364 (view related notices)

Published 12 January 2026, 4:49pm



Scope

Reference

JS/LRL/25/014

Description

Lancashire Renewables Limited (LRL) was established for the operation and management of two central waste treatment facilities. LRL's key objectives are to receive, treat and transport contract waste in accordance with the targets and service requirements set out in the Service Level Agreement between the company and its majority shareholder, Lancashire County Council.

Each of LRL's two waste treatment facilities is designed to process and handle various municipal waste types arranged and supplied by Lancashire County Council and Blackpool Council. From April 2026, this means that source separated food waste from Lancashire's Households will be transported for processing into LRL's site based at Farington, Leyland (PR26 6TB).

Until 2014, LRL had an anaerobic digestion (AD) process in operation. The inputs came from residual 'black bin' household waste with organics separated via rotating trommels and metal separation. Waste was then fed into pre-treatment technologies before the organic soup produced was fed into the anaerobic digestion process. Gas produced from the process was pre-treated to remove hydrogen sulphide and other undesirable compounds before being fed into a gas storage vessel prior to use by the power generation infrastructure. The biomethane supplied two MWM TCG 2020K V12 engines with fuel to generate electricity which was then used on-site rather than exported into the grid.

The historical AD pre-treatment process was inefficient and expensive to run. As a result, the process ceased to operate in 2014 and the associated areas were put in a state of preservation and mothballed. It is estimated that the gas engines were only used for approximately 10000 hours prior to being decommissioned, having being installed circa 2010.

As household source-separated food waste collections in England are mandatory from April 2026, LRL is looking to recommence a new AD process at its site based at:

Lancashire Renewables Limited

Farington Waste Recovery Park

Sustainability Way

Leyland

PR26 6TB

To facilitate this, 2 no. gas engines / gensets are required to be brought back into operational service at LRL's Leyland site. Therefore, the contract will include offsite initial refurbishment, delivery back to site, installation and testing, followed by ongoing service and maintenance. It is likely that the initial refurbishment and install back on site of the two gensets must be completed by 31/03/2026.

It is possible that the same works may be undertaken, and hence the contract could require an additional 2 no. gas engines / gensets of the same manufacturer and model at LRL's Thornton facility. The contract will include provision for this, although it is to be decided at a later date whether this will be exercised.


Contract 1. Initial Refurbishment, Maintenance and Service for Gas Engines / Gensets

Supplier

Contract value

  • £2,000,000 excluding VAT
  • £2,400,000 including VAT

Above the relevant threshold

Award decision date

12 January 2026

Date assessment summaries were sent to tenderers

12 January 2026

Standstill period

  • End: 21 January 2026
  • 8 working days

Earliest date the contract will be signed

26 January 2026

Contract dates (estimated)

  • 2 February 2026 to 1 February 2030
  • Possible extension to 1 February 2032
  • 6 years

Description of possible extension:

Lancashire Renewables reserves the right to extend the contract by up to two years if the contract is deemed to be operating well, to maximise the benefit of a longer term collaborative relationship for both parties.

Main procurement category

Services

Options

The right to additional purchases while the contract is valid.

Lancashire Renewables may undertake the same initial refurbishment and ongoing service and maintenance at its second site, in Thornton.

CPV classifications

  • 50531200 - Gas appliance maintenance services
  • 50532300 - Repair and maintenance services of generators

Contract locations

  • UKD - North West (England)

Information about tenders

  • 5 tenders received
  • 4 tenders assessed in the final stage:
    • 3 submitted by small and medium-sized enterprises (SME)
    • 0 submitted by voluntary, community and social enterprises (VCSE)
  • 1 supplier awarded contracts
  • 3 suppliers unsuccessful (details included for contracts over £5 million)

Procedure

Procedure type

Open procedure


Supplier

GENSERV NORTHWEST LTD

  • Companies House: 12384606
  • Public Procurement Organisation Number: PNXZ-6492-HDQH

198 Liverpool Road

Manchester

M44 5DB

United Kingdom

Region: UKD34 - Greater Manchester South West

Small or medium-sized enterprise (SME): Yes

Voluntary, community or social enterprise (VCSE): No

Supported employment provider: No

Public service mutual: No

Contract 1. Initial Refurbishment, Maintenance and Service for Gas Engines / Gensets


Contracting authority

LANCASHIRE RENEWABLES LIMITED

  • Companies House: 05881147
  • Public Procurement Organisation Number: PYPB-7495-RHWR

Environmental Education Centre, Farington Waste Recovery Park, Sustainability Way

Leyland

PR26 6TB

United Kingdom

Region: UKD45 - Mid Lancashire

Organisation type: Public authority - sub-central government