Planning

Mablethorpe Roof Refurbishment

  • Department for Education

F01: Prior information notice (prior information only)

Notice identifier: 2023/S 000-001235

Procurement identifier (OCID): ocds-h6vhtk-0397b2

Published 16 January 2023, 10:53am



Section one: Contracting authority

one.1) Name and addresses

Department for Education

Sanctuary Buildings, 20, Great Smith Street

London

SW1P 3BT

Contact

Rachel Tate

Email

Rachel.Tate@macegroup.com

Country

United Kingdom

Region code

UKF - East Midlands (England)

Internet address(es)

Main address

https://education.app.jaggaer.com/web/login.html

one.3) Communication

Additional information can be obtained from the above-mentioned address

one.4) Type of the contracting authority

National or federal Agency/Office

one.5) Main activity

Education


Section two: Object

two.1) Scope of the procurement

two.1.1) Title

Mablethorpe Roof Refurbishment

Reference number

FS0580

two.1.2) Main CPV code

  • 45214200 - Construction work for school buildings

two.1.3) Type of contract

Works

two.1.4) Short description

The purpose of the project is to carry out a replacement of flat roof areas with a new built-up system at Springwell Alternative Academy in Mablethorpe.

two.1.5) Estimated total value

Value excluding VAT: £238,000

two.1.6) Information about lots

This contract is divided into lots: No

two.2) Description

two.2.2) Additional CPV code(s)

  • 45214200 - Construction work for school buildings

two.2.3) Place of performance

NUTS codes
  • UKF - East Midlands (England)
Main site or place of performance

Springwell Alternative Academy

Mablethorpe

two.2.4) Description of the procurement

The purpose of the project is to carry out a replacement of flat roof areas with a new built-up system at Springwell Alternative Academy in Mablethorpe. The works include but are not limited to:

A new built-up roof system, over the existing plywood deck which is to be retained.

Retain 3no single glazed rooflights and 10no redundant rooflights to be removed.

Anti-climb barriers to be retained and installed to the face of the building

Retain and adapt water outlets to suit new levels.

Remove and reinstate cladding.

The decommissioning and temporary removal of lightening protection, mushroom vents, sprinkler system. All services are to be tested and commissioned once reinstated.

A new ballasted edge protection system which is to be installed as part of the works with the associated planning requirements.

Design work included for tender return and construction issue drawings.

two.3) Estimated date of publication of contract notice

23 January 2023


Section four. Procedure

four.1) Description

four.1.8) Information about the Government Procurement Agreement (GPA)

The procurement is covered by the Government Procurement Agreement: Yes