Section one: Contracting authority
one.1) Name and addresses
Department for Education
Sanctuary Buildings, 20, Great Smith Street
London
SW1P 3BT
Contact
Rachel Tate
Country
United Kingdom
Region code
UKF - East Midlands (England)
Internet address(es)
Main address
https://education.app.jaggaer.com/web/login.html
one.3) Communication
Additional information can be obtained from the above-mentioned address
one.4) Type of the contracting authority
National or federal Agency/Office
one.5) Main activity
Education
Section two: Object
two.1) Scope of the procurement
two.1.1) Title
Mablethorpe Roof Refurbishment
Reference number
FS0580
two.1.2) Main CPV code
- 45214200 - Construction work for school buildings
two.1.3) Type of contract
Works
two.1.4) Short description
The purpose of the project is to carry out a replacement of flat roof areas with a new built-up system at Springwell Alternative Academy in Mablethorpe.
two.1.5) Estimated total value
Value excluding VAT: £238,000
two.1.6) Information about lots
This contract is divided into lots: No
two.2) Description
two.2.2) Additional CPV code(s)
- 45214200 - Construction work for school buildings
two.2.3) Place of performance
NUTS codes
- UKF - East Midlands (England)
Main site or place of performance
Springwell Alternative Academy
Mablethorpe
two.2.4) Description of the procurement
The purpose of the project is to carry out a replacement of flat roof areas with a new built-up system at Springwell Alternative Academy in Mablethorpe. The works include but are not limited to:
A new built-up roof system, over the existing plywood deck which is to be retained.
Retain 3no single glazed rooflights and 10no redundant rooflights to be removed.
Anti-climb barriers to be retained and installed to the face of the building
Retain and adapt water outlets to suit new levels.
Remove and reinstate cladding.
The decommissioning and temporary removal of lightening protection, mushroom vents, sprinkler system. All services are to be tested and commissioned once reinstated.
A new ballasted edge protection system which is to be installed as part of the works with the associated planning requirements.
Design work included for tender return and construction issue drawings.
two.3) Estimated date of publication of contract notice
23 January 2023
Section four. Procedure
four.1) Description
four.1.8) Information about the Government Procurement Agreement (GPA)
The procurement is covered by the Government Procurement Agreement: Yes