Procurement

MEP Tender Notice

  • COURTAULD INSTITUTE OF ART
  • KING'S COLLEGE LONDON

Procurement identifier (OCID): ocds-h6vhtk-06e802

Description

MEPH

1. Survey, isolate, strip out and dispose of relevant existing services in a safe manner.

2. Survey and report on condition of existing services in the Phase 1 areas that are being retained

3. Enabling works and decommissioning of Phase 1 works

4. CCTV Survey of existing drainage/rainwater stacks

5. Above ground soil & waste drainage consisting of new pipework, thermal and acoustic insulation, chlorination and treatment

6. Above ground rainwater drainage system consisting of new pipework, thermal and acoustic insulation, sump pump

7. Supply and installation of sanitaryware including, but not limited to WCs, sinks, taps

8. Domestic cold water services including mains supply, boosted distribution, storage tank, booster set, pumps, conditioner, trace heating, leak detection and insulation

9. Water booster set located in the 'Strands vaults', provided as Part of Phase 1 is to be extended as part of Phase 2 works.

9. Hot water plant and distribution pipework including insulation

10. Low temperature hot water (LTHW) heating systems

11. Dry riser system

12. Water treatment, flushing & chlorination

13. Specialist water treatment / humidification systems (RO plant)

14. Pipework insulation & trace heating

15. Chilled water systems

16. Heat pump plant & associated infrastructure

17. Underfloor heating systems

18. Variable refrigerant flow (VRF) system including cooling units, controllers, refrigerant & condensate pipework distribution, FCUs and insulation

19. Refrigerant leak detection

20. Electric heating systems - radiant heaters and controls

21. Gas installation to Kitchens

22. Boiler flue

23. Meters - heat interface, water and gas. All meters shall be connected and monitored from the Courtauld's automated metering system.

24. Liaison with Thames Water

VENTILATION

1. Air handling units and heat recovery units

2. Toilet extract fans

3. Attenuators including cross talk

4. Fresh air intake ductwork

5. Exhaust ductwork 6. Supply ductwork 7. Extract ductwork 8. Kitchen fire rated ductwork 9. Diffusers, grilles and flexible connections

10. Motorised fire / smoke dampers

11. Thermal Insulation

12. Acoustic lining where required

12. Ductwork cleaning

13. General fire rated ductwork

15. Volume control dampers

15. Variable air volume (VAV) systems

16. Smoke extract and smoke control systems

17. Natural ventilation controls & actuated windows

18. Air handling plant ancillary equipment

19. Ceiling and wall fans within East wing & Library

ELECTRICAL

1. Survey, isolate, strip out and dispose of relevant existing services in a safe manner.

2. Survey and report on condition of existing services in the Phase 1 areas that are being retained

3. Enabling works and decommissioning of Phase 1 works

4. Liaison with UKPN for their works involving upgraded supply

6. LV switchgear

7. Distribution boards

8. Sub-main cabling distribution

9. Sub-metering

10. Busbar systems

11. Life safety LV cable distribution

12. Life safety emergency lighting cable

13. Primary and secondary containment

14. Mechanical power supplies

15. Power supplies for specialist systems

16. Floor boxes

17. Isolators

18. Sockets

19. General lighting systems

20. Emergency lighting systems

21. Lighting Control including cabling

22. Transformer enclosures

23. Hook up connection to be utilised for a generator to provide temporary power for changeover of UKPN supply

24. Energy metering & monitoring

25. Main equipotential bonding

26. Earthing to lift shafts

27. Surge protection

28. Electromagnetic screening

29. Automatic Transfer Switches (ATS) including mimic panels for evacuation lifts.

MEP COMMON

1. Plant handling and movement

2. Testing & commissioning

3. Interfaces & overall systems integration

4. Bracketry and secondary steelwork

5. O&M manuals

6. Labelling and identification

7. Integrated and black building testing

8. Integrated systems testing (IST)

9. BREEAM requirements

10. Surveys and validations

11. Final clean

12. Temporary protection

13. Inertia bases

14. Client training

15. 12 month warranties

16. Samples

17. Soft landings

18. Noise & vibration control

19. Seasonal commissioning

20. Fire protection pillows within containment

21. Intumescent Putty Pads (supply and install) / Hockey Sticks (supply and free issue to Dryliner)

22. Fire Stopping and Fire Collars to all penetrations of 50mm x 50mm or less through all walls or floors (including concrete).

23. Existing services being retained

24. Arrange lift & shift equipment

25. BWIC up to 50mm

26. Big foot system and hop overs