Re-development of the existing office building situated at Bankside House, 76-80 Southwark Street, London, SE1 0PN
- Glasgow City Council (as administering authority for the Strathclyde Pension Fund)
Procurement identifier (OCID): ocds-h6vhtk-047946
Description
The contract location is Bankside House, 76-80 Southwark Street, London, SE1 0PN. The
property spans two sites which were formerly separate entities and were redeveloped to
form a single office building in 1971. The original Victorian warehouse structure remains to
the eastern portion of the site while that at the western end was constructed in 1971. The
property was substantially remodelled and clad in 2001.
The contract works comprise the design, construction, remodelling and refurbishment of the
existing office and ancillary plant accommodation at basement, and ground to fourth floor
levels. The existing fifth floor level is to be demolished and new fifth and sixth floors will be
constructed with new plant and roof terrace above. The building will be substantially rebuilt
or reclad to the west, south and part north elevations. New terraces will be formed at fifth
and sixth floors to the rear. Internally, the cores are to be rebuilt to provide high quality office
plates over basement to sixth floors. The entrance will remain on the corner of Great
Guildford and Southwark Streets. New cycle store and plant areas will be provided at
basement level, along with a new feature stair linking the office accommodation at ground
and basement.
The Procurement is being conducted by DTZ Investors for Glasgow City Council as administering authority for the Strathclyde Pension Fund (SPF).
Notices
F03: Contract award notice
- Notice identifier
- 2025/S 000-030859
- Published
- 9 June 2025, 11:09am
F02: Contract notice
- Notice identifier
- 2024/S 000-020166
- Published
- 2 July 2024, 4:30pm