Replace 19.429km of 132kV pressurised oil filled cables with 132kV non-pressurised XLPE solid cables

Replace 19.429km of underground pilot wire with fibre optic cables

Supply and install all ducting for the 132kV non-pressurised XLPE solid cables and fibre optic cables

Complete all civils work (excavation, backfilling and reinstatement) associated with the installation

Complete a single lane width reinstatement the length of the cable route (section approx. 1.8km) on the East Lancs road (A580) following the cable installation (Section 58 requirement)

Scope of this work is for the cable civils only however we are optioning the cable installation costs.

Replace existing outdoor sealing end structures at Bootle, Fazakerley and Gillmoss grid substations

The existing modern non-pressurised XLPE solid cable sections along the two circuits including the outdoor sealing ends structures will be retained and reused.

Drain, cut and cap of redundant oil filled cables and drain all associated oil tanks

Notices

F06: Contract award notice – utilities

Notice identifier
2025/S 000-029452
Published
3 June 2025, 11:48am

F07: Qualification system – utilities

Notice identifier
2022/S 000-005513