LCRCA Consultancy Agreement - Water & Filtration
- Merseytravel
Procurement identifier (OCID): ocds-h6vhtk-0774b8
Description
The purpose of this commission is for the Contractor to undertake a feasibility study and cost analysis including anticipated return on investment providing a detailed report focusing on:
• The reuse of tunnel sump water for tunnel wall washing.
• The reuse of building roof and waste water for flushing building toilets and use in sinks and showers.
The Contractor shall undertake the feasibility study following RIBA stages:
• RIBA stage 0 - Strategic Definition.
• RIBA stage 1 - Preparation and Briefing.
• RIBA stage 2 - Concept Design.
The feasibility study shall consider the reuse and filtration of sump water to current safe water quality standards considering the production requirements of the tunnel washing operations
Notices
UK7: Contract details notice
- Notice identifier
- 2026/S 000-088344
- Published
- 17 September 2026, 3:54pm