Anchorage A-Frames Replacement Scheme
- Humber Bridge Board
Procurement identifier (OCID): ocds-h6vhtk-06a93c
Description
The Humber Bridge Board conducted this procurement to appoint a suitable Contractor to undertake the design and construction of the replacement for the existing A-frames rocker bearings on the Hessle and Barton Anchorages of the Humber Bridge. The Scheme involves developing the conceptual design provided for the scheme into a detailed design to replace the existing Barton and Hessle anchorage A-Frames with a pair of vertically orientated pendels and a wind shoe that facilitates all current load and translation requirements.
Notices
UK7: Contract details notice
- Notice identifier
- 2026/S 000-097502
- Published
- 15 October 2026, 2:01pm
UK6: Contract award notice
- Notice identifier
- 2026/S 000-082312
- Published
- 28 August 2026, 3:51pm
UK4: Tender notice
- Notice identifier
- 2026/S 000-050981
- Published
- 29 May 2026, 4:01pm