Lot description
A fixed electrical installation includes all parts of a distribution system from the main incoming supply point through to wiring accessories such as sockets and light fittings, and everything in between. Because the majority of this part of the installation is unseen, it is often forgotten in terms of its testing and inspection. The fact is that it is vitally important that all wires, cables, accessories and switching equipment are maintained well in order to ensure safety. Guidance suggests that fixed installations are tested on average every 5 years; however, ultimately this is the customer’s decision. The process of FIT involves a similar process to that of PAT in that a thorough visual inspection is carried out along with electronic tests. Engineers are looking to identify any potentially dangerous defects within the system that may lead to fire or injury. The benchmark for this inspection and test process is BS 7671 Requirements for Electrical Installations (The IET Wiring Regulations) which provides guidance on how systems must be designed, installed and maintained. Deviations from this British Standard are most likely to be the cause of any problems. After an initial visual inspection, several electronic tests are carried out by injecting test voltages and current through the system to determine the integrity and functionality of cables, accessories and disconnection devices. This form of test and inspection is paramount to safety in the workplace. A written Periodic Inspection Report (PIR), also known as an Electrical Installation Condition Report (EICR) will be provided as evidence that your fixed installations have had a combined inspection and electrical safety test. In addition to details and characteristics of the installation that has been tested the report will also provide the client with a list of any defects or deviations from the British Standard that may have been identified during testing. The reports will also include recommendations for necessary consequential remedial work.
Lot status
Active
Lot start date
3 October 2023
Lot end date
30 September 2027
Contract delivery locations
Lot CPV classifications
- 31200000 - Electricity distribution and control apparatus